Download presentation
Presentation is loading. Please wait.
Published byBrendan Peters Modified over 9 years ago
1
CubeSat DeOrbit System TREVOR JACKSON JOSHUA BARHAM TROY TARNACKI JOSEPH MCNAMARA TIMOTHY LYNCH JOE POWELL AMANDA SOKOLSKY JASON HARRIS MACKENZIE WEBB
3
Currently TRL 3-4 Laboratory breadboard validations conducted Orbit analysis begins Thermal analysis nearing completion Vacuum testing at Langley Research Center begins end of February/early March Vacuum test apparatus underway
4
Increasing TRL TRL increase to 5 through initial vacuum testing in 8ft. vacuum chamber TRL increase to 6 through formal vacuum testing in 5ft. vacuum chamber Handoff project in May for increase to TRL 7 through thermal/vacuum, vibration, and acoustic analysis
5
Initial Vacuum Chamber Testing Gravity assisted deployment
6
Assembly Updates EXPANDED VIEW OF BASEPLATE ASSEMBLY Electronics debugging Hardware /Software Kapton Insulator Heating Wire Balloon Construction/ Tether Mechanical Door Testing Membrane Cutting Wire Thermal Gasket Baseplate CubeSat Interface packed balloon
7
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.