Flood Analysis in Geum River & Countermeasure Establishment Flood Analysis in Geum River & Countermeasure Establishment the 8th Hydro Asia 2014 Hydraulic.

Similar presentations


Presentation on theme: "Flood Analysis in Geum River & Countermeasure Establishment Flood Analysis in Geum River & Countermeasure Establishment the 8th Hydro Asia 2014 Hydraulic."— Presentation transcript:

1 Flood Analysis in Geum River & Countermeasure Establishment Flood Analysis in Geum River & Countermeasure Establishment the 8th Hydro Asia 2014 Hydraulic and Hydrology Session 1

2 2 1 Climate Change in Korea

3 1 In 100 years : Temp. 5℃ ↑, precipitation 17% ↑ 2 times more than global warming 0.74 ℃ [Change of Global Mean Temp.] 1.7 ℃ [Change of Mean Temp. of Korea] (Source : KMA, Institute) Climate Change in Korea

4 Water management under Changes & Challenges Frequency, Intensity of Flood & Drought increase - Flood damage (billion Won) : 123.6(’71)→1,990.4(’05) Evaportranspiration & Water demand etc. increase Regional rainfall deviation & uncertainty increase Typhoon intensity & Heavy rain increase - Typhoon intensity : 984→960hpa, 24hpa↓/36yr - Heavy rainy days : 20→31days, 11days↑/50yr 1 Climate Change in Korea

5 2 2 Climatic & Geographical Characteristics in Korea

6 The 70’s : 1,225mm → Recently : 1,465mm, 19.6% ↑ Since the 1970, drought with every 5-7 years Annual Precipitation : 1,277mm 2 Climatic Characteristics – Precipitation trends 895 197719821988 1994 20012008 1,0071,001 953 1,061 1,016 1,383 1,409 1,736 1,611 1,669 1,791 1,908 Trough : 817.5 ㎜ (60.7%) Monsoon : 327.0 ㎜ (24.3%) Typhoon : 201.4 ㎜ (14.9%) Trend 5yr 6yr 7yr 1465mm 1225mm

7 Effective Water management is absolutely required Trough : 362.5 ㎜ (41.4%) Monsoon : 321.8 ㎜ (36.7%) Typhoon : 191.8 ㎜ (21.9%) Precipitation During Summer Season (JJAS) : 876.1 ㎜ (65% of the Total) 2 Climatic Characteristics – Monthly precipitation

8 Annual Precipitation : Global 1.6 times Water per Capita : Global 1/6 times 1,277 2,629 534 201,364 715 22,741 80716,427 867 7,794 1,690 4,933 1,220 4,907 627 4,530 2 Climatic Characteristics – Water per capita

9 Mountainous with Steep slope Korea land Seasonal discharge variation is very severe (Flood season : much water ⇒ flood, Dry season : small water ⇒ drought) 2 Water per capita Geographical Characteristics

10 2 3 Geum Gang River & GRRP (River Restoration Project)

11 3

12 3 Youngju dam Hwasun Damyang Han Riv. Seomjin Riv. Nakdan Youngsan Riv. Chilgok Gangjeong Goryeong Gangjeong Goryeong Dalseong Hapcheon Changnyeong Changnyeong Haman Gangcheon Yeoju Ipo Seungchon Juksan Dam Weir Flood Retention Res. Barrage Expansion Barrage Expansion Introduction of GRRP Andong-Imha connection Andong-Imha connection Gumi Sangju Bohyeon dam Bohyeon dam Nakdong Riv. Barrage Expansion Barrage Expansion Project Dredging : 43 million ㎥ Multi-purpose Weir : 3 Bank Reinforcement : 117 ㎞ Embanking Agr. Res. : 30 Farmland Remodeling : 17 Small Hydro-power : 3 Eco-stream : 199 ㎞ Bike Road : 301 ㎞ Basin Area : 9,912 ㎢, Basin Length : 397 ㎞ Geum Riv. Baekje Sejong Gongju

13 3 Geum Gang River & GRRP(River Restoration Project) Riverbed and Water Level Profiles of the Geum River Estuary barrageDaecheong dam Sejong weir 137 ㎞ Gongju weir Baekje weir 24.2MCM 15.5MCM 5.7MCM length depth

14 3 Geum Gang River & GRRP(River Restoration Project) Status of Weirs in the Geum River Sejong-weirGongju-weirBaekje-weir Weir Length(m) 348280311 Capacity(10 6 m 3 ) 5.7 15.5 24.2 Hydropower plants Capacity ( ㎾ ) 2,3103,0002,640 Fishway(ea) 121 Sejong-weirGongju-weirBaekje-weir

15 2 4 TEAM PROJECT

16 4 MISSION □ Find various solutions to flood problems at target areas □ and Verify your solution !

17 4 TEAM PROJECT Target area

18 4 TEAM PROJECT Target area

19 AREA 1 4 TEAM PROJECT NO. 21+000 NO. 21+660 Length : L=2,860m (No. 18+550 ~ No. 22+650) Bank top level: Right(7.75m~9.16m), Left(-) Flood Level : EL. 6.76m ~ EL. 7.47m (100year return period) Cultivated Land Altitude: EL. 3.70m ~ EL. 3.75m FLOW

20 AREA 1 4 TEAM PROJECT NO. 21+000 NO. 21+660 Problems : Sudden river narrows, Non-bank area(left side) - Frequent flooding at cultivated land - River bed sedimentation at direct downstream by Bottleneck phenomenon - Oppose the river improvements by local residents Riverbed sedimentation FLOW Non-Bank area

21 AREA 2 4 TEAM PROJECT Length : L=1,890m (No. 26+740 ~ No. 28+630) Bank top level: Right(8.55m~9.23m), Left(10.00m~10.36m) Flood Level : EL. 8.01m ~ EL. 8.35m (100year return period) BANK

22 AREA 2 4 TEAM PROJECT BANK Problems : Sudden river narrows - Concerned about right-bank erosion by speedy flow velocity - River bed sedimentation at direct downstream by Bottleneck phenomenon

23 DEM at target areas □ Modeling Analysis using 1-D (HEC-RAS,…) & 2-D (CCHE-2D, MIKE,..) tool Go! Go! Go! Move! Move! Move! □ Given data : A river bed measurement data (CAD-type) Frequency flood discharge at target point Other necessary data for analysis..

24 □ Segregation of duties Go! Go! Go! Move! Move! Move! TEAMTarget areaRemarks 1Area1 2Area2 3Area1 4Area2 5Area1 6Area2 - Elemental analysis => joint execution(3 teams) - Find solution => each team - Verify solution => each team □ 1 target area for 3 teams

25 Go! Go! Go! Move! Move! Move!

26


Download ppt "Flood Analysis in Geum River & Countermeasure Establishment Flood Analysis in Geum River & Countermeasure Establishment the 8th Hydro Asia 2014 Hydraulic."