Download presentation
Presentation is loading. Please wait.
Published byDustin Rich Modified over 9 years ago
1
Project X Presentation November 19, 2010
2
Risk management plan (RMP) Foresee risks Estimate plan effectiveness Prepare plans to mitigate problems
3
Foresee risks Working with Department of Defense Product may be dangerous Want to protect workers, and public Important to avoid lawsuits
4
Estimate plan effectiveness Imagine possible risks Plan for potential outcome – Good – Bad Be prepared in the event of all outcomes Routinely test our plan in imagined but plausible scenarios
5
Prepare plans to mitigate problems Use test results to develop action plans Ask workers for opinions of safety Study other corporations safety evaluations Research real danger events and their outcomes Practice, practice, practice Remain vigilant
6
Education Advantages – Feasible – Acceptable to most – Protection – Avoid lawsuits Disadvantages – Dangers unforeseen – Perceived cost – Extra work – Time waste
7
FMEA Failure mode and effects analysis is a way to evaluate potential production problems – Concept FMEA – Design FMEA – Process FMEA We can easily see breakdowns in current companies
8
References O’Dwyer, M.J. (2010) Real-Life Examples of FMEA. http://www.brighthub.com/office/project- management/articles/72966.aspx. Last accessed November 19, 2010.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.