BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 20152.

Similar presentations


Presentation on theme: "BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 20152."— Presentation transcript:

1

2 BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 20152

3 Contents -BI.DIS system parameters -System and pulse generator description -Test results -Final design -Planning, Resources, EVM -Conclusions R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 3

4 BI.DIS system parameters R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 ParameterUnitValue Deflection angle at 160 MeV (vertical) mradDIS0: 3.77 DIS1: 4.23 DIS2: 3.84 DIS3: 3.4 DIS4: 3.97 Kick flat-top durationµsDIS0: 20 DIS1: 170 DIS2: 320 DIS3: 470 DIS4: 620 Kick rise time (1-99)%µs≤ 2 Kick flat-top ripple (p-p)%≤ ±1 Magnet currentA~ 1000 A PFN impedanceΩ6.25 PFN voltagekV6.25 Repetition rateHz1.1 ~ 150µs 4

5 System and pulse generator description R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 5 magnets in one vacuum tank 5 Pulse Forming Networks 6.25 Ω (one per magnet) + 1 spare PFN voltage up to 10 kV ( ~ 7 kV nominal with H - operation) IGBT switch (2 × 6.5 kV device in series) fixed duration (different for each PFN, max 620 µs) short-circuited magnet recuperation of a large fraction ( > 50 %) of the PFN stored energy (1270 J) 5

6 BI.DIS10 vacuum tank R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 Tank (with 5 magnets) under vacuum in SAL6 test cage ready for connection to pulse generator. Pressure ok: 2e-9 mbar. TE-VSC will re-test the water circuit before their final acceptance. Spare tank to be tested later. ENG. Spec: EDMS 1454374 6

7 Prototype pulse generator tests results R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 Impedance ~6.25 Ω chosen for 2 µs rise time. 2×6.5 kV IGBTs in series for operation at ~7 kV/1000 A. Switches: ABB or Hitachi are suitable. 60 cells for 620 µs pulse (60 capacitors of 1 µF) to fill the available space and have a minimum flat-top ripple. 7

8 Prototype pulse generator tests results R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 Magnet current (= Kick) Voltage to reach 1000 A is 7 kV due to resistive losses and rising edge shape adjustment (and optimisation) leading to a PFN impedance near 7 Ω. Rise-time ≤ 2 µs achieved with more than 500 ns margin. 8

9 Prototype pulse generator tests results R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 Ripple ≤ ±1 % achieved with foreseen improvement to ≤ ± 0.5 % in final installation. Magnet current (= Kick) Pulse lengths from 170 to 620 µs achieved with 1, 2, 3 and 4 capacitor rows. 20 µs still to be done. 9

10 Pulse generators final design R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 Each cabinet rack contains two separate PFNs of 60 L-C cells maximum L-C cell PFN Rack Switch rack 10

11 Pulse generators final design R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 Each PFN cabinet half is “hermetic” and has an integrated automatic fire detection and CO2 injection system. Pressure relief valves have to be installed to limit the CO2 pressure in the rack. Pressure relief valveFront cell IGBT Switch Earthing device 11

12 Pre-series pulse generator R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 Pre-series status 17 November 2015 12

13 BI.DIS Prototype Definitive Design Type Test  Performance  Reliability  Operational conditions  Safety  Preliminary Controls Functional Spec. First Prototype Design Update Test Improved Design Review  12/2014  07/2015 Realisation and Development Proof of Concept  03/2016 Engineering Spec. Start of Series Production Definitive Design R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 13

14 Present Status and tests still to be performed STATUS PFN mechanical design complete at 95 % (CATIA 3D models and 2D fabrication drawings). In stand-by due to the illness of P. Faure. One full pre-series almost ready for test. Two IGBT types selected among four manufacturers to meet the pulse required rise time Tests with full pulse length (620 ms) and nominal required current (1000 A) performed. Fire extinguisher test performed. Final three cabinets ready for delivery by the manufacturer. More than 60 coils ready for the series. NEXT TEST Full operational conditions with closed cabinet to see if we have thermal issues. The departure of Rodolphe will slow down the restart. R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 14

15 BI.DIS Generator Assembly Schedule MarJunJulAugSepOctNovDec2017 Start Series Production 1 st Rack Ready End April Ready to install End December 2 weeks (FSU!) Cabling 1 week Cell Tuning 2 weeks Verification Test Feb 1 st Definitive Generator 2 weeks (2 x FSU!) Rack Assembly May Apr 9 weeks March Start 2 nd Rack June 1 week Disassembly Start 3 rd Rack September 2 nd Rack Ready End July 3 rd Rack Ready November Fast Interlock Trigger System 2 nd Rack Fast Interlock and Timing Controls Test 3 weeks 3 rd Rack Validation 2 weeks 9 weeks 1 week R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 15

16 Resources for 2016 (FPS only) 1.Material to be ordered and delivered in 2016 (6 PFNs) Mechanical components: 100 kCHF Electrical components: 80 kCHF Miscellaneous: 20 kCHF Total: 200 kCHF 2.FSU Coil manufacture : 35 man.week PFN cabinet assembly: 18 man.week Total: 53 man.week 3.CERN FTE Drawings update and orders: 0.3 Assembly: 0.4 Supervision and tests: 1.3 Total: 2 FTE R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 16

17 EVM: Provide BI.DIS magnets Year 20082009201020112012201320142015 PV 1311497714660000 EV 01933263103000 AC 167158385620006 Metrics per year in kCHF Cumulative metrics per year in kCHF Year 20082009201020112012201320142015 PV 131280356502562 EV 0193196459562 AC 167324362418438 444 R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 17

18 EVM: Provide BI.DIS pulse generator Year 20082009201020112012201320142015201620172018 PV 006385 16538993334714938 EV 00033201170383434 AC 3316013582166213368 Metrics per year in kCHF Cumulative metrics per year in kCHF Year 20082009201020112012201320142015201620172018 PV 00631482333997881721206822172255 EV 000332344057881221 AC 334942303124786911059 R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 18

19 Conclusion The new BI.DIS generators are entering their production phase but the full pre-series version still has to be validated. Test of the full pre-series one will start hopefully this year for completion early next year. The goal of having the full system ready for installation end of 2016 should be met assuming that the necessary resources will be available at the right moment. The management has to set priorities accordingly. R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 19

20 THANK YOU FOR YOUR ATTENTION! R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November 2015 20