RADWG 4 TH - 2012 4 TH JULY 2012 G. Spiezia (EN/STI/ECE)
2
AGENDA Matters arising and SEU events CNRAD and PSEAST area H4IRRAD LHC Weekly report PSI test- Voltage regulators, Current source, Switch
3
Technical stop LHC TS2 Reading of the radfets-analysis on going (PS and SPS) LHC TS3 Moved to September. Consequences for CNRAD will be communicated (if any)
4
PSI test plan -1 Date Equipment Owner Test groupDUT 1 FebruaryEN/STI PXI power supply 18-19February EN/STI Voltage regulator Cypress Toshiba Diff Amp TE/EPC AC/DC 17-18 MarchBI BPM electronics 24-25 MarchEN/STI Analog switches current regulator RadFet 21-22 April TE/EPCEN/STIMosfet-1 EN/STI RadMon prototype BI Beam Loss Monitor
5
PSI test plan-2 Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage reference July 1 st TE/EPC EN/STI- TE/EPC PWM, Transceiver EN/STI Profibus module 28-29JulyBI BPM components August/SeptemberTE/EPC FGC lite components The collaboration is to renew for the next years. 1 test per month?
6
PSI – Irradiated boards and cables
7
The amount of boards and cables from previous irradiation start to become significant Use a label on the DUT and on the cables to identify Equipment Group/Responsible contact Date of the test Specify if you want to recuperate or throw it away (once the activation levels are low). The material is under your responsibility
8
PSI - Note on Profibus controller Anybus IC. Tested at PSI to implement the data communication from an acquisition board to a PLC ASIC does not stand radiation (overcurrent consumption as soon as beam is on) Work-around IP core for FPGA could be bought Use of ModBus. Require a rad tol RS485 transceiver. Good candidate?
9
CEA – 1 MeV facility Request of beam time for 2013 to be sent by next week Test is advised for equipment in DS LHC areas and SPS Passive test can be an option Send your request by specifying the components and the location A brief communication is appreciated if you do not consider such a test Beam slots in October/ November
10
TID test for the future Use of external facility under consideration GIF++. Dedicated source at CERN Foreseen for the experiments Negotiations to get test slots and have a Co60 source
11
News on NanoFip purchase Ordered 2 batches of 5000 A3P400-PQG208 each Batch 1 (non programmed) expected on 03.09.2012 Batch 2 (programmed and marked with logo) expected on 26.11.2012 ~10 components per batch will be tested at PSI @ E. Gousiou
12
SEU events in LHC Summary at the LMC on 20 June by M. Brugger https://espace.cern.ch/lhc-machine- committee/Presentations/1/lmc_138/l mc_138i.pdf https://espace.cern.ch/lhc-machine- committee/Presentations/1/lmc_138/l mc_138i.pdf http://radwg.web.cern.ch/RadWG/
13
Conferences Topical workshop on electronics for Particle Physics (TWEPP-12) The registration is open 17-21 September 2012, Oxford http://www.physics.ox.ac.uk/twep p12/ http://www.physics.ox.ac.uk/twep p12/
14
Back-up
15
SEU events in LHC DateTitle LHC point AreaTypeSEU? Beam Dump Equipment 04/05/2012 Cryogenic compressor stop in P8 Point 8US85soft SEETBCFALSECRYO 03/05/2012 RF trip module M2B2, L8B2 Point4UA47soft SEETBCTRUERF 19/04/2012QPS Wfip lostPoint 5DSsoft SEEYESFALSEQPS 16/04/2012Power converter- FGCPoint 7ARCssoft SEETBCTRUEEPC 13/04/2012Power Converter FaultPoint 1RR17hard SEEYESTRUEEPC 10/04/2012QPS-Protection 600 APoint 5UJ56soft SEETBCTRUEQPS 09/04/2012Power Converter FaultPoint 1UJ16hard SEEYESTRUEEPC 04/04/2012 Trip of QPS 4R8 - loss of cryo maintain Point 8LSS-TBCTRUEQPS
16
Course conference workshop Course radiation effects R. Gaillard on CERN training web site SEE symposium April 2012 http://radhome.gsfc.nasa.gov/radhome/SEE/ http://radhome.gsfc.nasa.gov/radhome/SEE/ NSREC July 2012 www.nsrec.net www.nsrec.net RADECS September 2012 www.radecs.com www.radecs.com