Production Manager 1 Strategic Planning Forecasting

Similar presentations


Presentation on theme: "Production Manager 1 Strategic Planning Forecasting"— Presentation transcript:

1 Production Manager 1 Strategic Planning Forecasting
Aggregate Plan (AP) Master Production Schedule (MPS) Material Req. Planning (MRP, JIT) Capacity Req. Planning (CRP, TOC) Scheduling, Sequencing of jobs/lots Process Control (SPC) Distribution of Goods

2 Production Manager 2 Product Development Product Mix
Raw Material Blending Facility Location Capacity Planning Project Management Quality Management Maintenance Human Resource Management

3 Capacity Planning Process Selection Investment, Econ. Of Scale
Break-Even Analysis Market Forecast, Risk Assessment Decision Trees Layout, SLP method

4 Transport, location Markets, raw material, labour, ...
Transport Models Facility Location Models Other considerations Multi Criteria Decisions Even > 1 decision maker AHP-method

5 Product Mix Resources known Determine Product Composition
Max Profit Contribution LP: Linear (NLP), Continous (IP), Deterministic (SP), Static (DP) Sensitivity Analysis Shadow Prices See ProductMix.xls in chapter 3, page 98- in W&A

6 Raw Material Handling Raw Material Blending (Diet)
Grading Raw Material Cutting Stock Packing, Loading Optimization Models (LP, IP) See Blending.xls chapter 4, page 160 in W&A Also CuttingStock.xls in chapter 6 page 327

7 Production Plans (AP) Seasonal peaks Aggregate Unit
Production, inventory, work force Overtime, shifts Subcontract, Backlog, Shortage Spreadsheet LP, Transportation Method Basis for Cash Flow Planning See ProductionScheduling.xls in chapter 3, page 108- in W&A and also AP pages

8 MPS, Production Schedule
AP provides the framework 4 – 6 weeks Max (Orders, Forecast) Frozen Time Zone Batch Sizes IP

9 Mat. Req. Plan (MRP, JIT) Reduces Inventories Requires:
Inventory Computer System Bill of Materials (BOM) “Frozen” Production Schedules Discipline Lot Sizing (IP, DP)

10 Inventory Control Based on Forecasting Minimizing Total Cost
Order Quantities/Lot Sizes (Q) Reorder Point (R) Optimization

11 Cap. Req. Plan (CRP, TOC) Balancing Capacity & Flow
Based on Process Analysis Find the Bottleneck (TOC) Simulation

12 Short Term Job Scheduling
Determine sequence (batches, orders) Processing times, Due dates SPT, EDD, LPT, … Criteria (flow, tardiness, …) Other related problems: Min Setup Times (TSP) Shift Scheduling Heuristics (GA, SA, TS)

13 Distribution Min Cost, Max Service Vehicle Routing
Capacity, Time windows Clark & Wright Savings Method Network Models, LP, IP Collection (milk, garbage, …)