Download presentation
Presentation is loading. Please wait.
Published byPaulina Harris Modified over 9 years ago
1
Personnel & Equipment Implement Measures To Reduce Your Unit’s Vulnerabilities to Terrorist Acts/Attacks Figure 1
2
MEASURES TO REDUCE YOUR VULNERABILITIES MEASURES TO REDUCE YOUR VULNERABILITIES PERSONNEL EQUIPMENT Training Planning Physical Security Physical Security Harden the Target MEASURES TO REDUCE YOUR VULNERABILITIES Figure 2
3
Figure 3 FORCE PROTECTION AWARENESS TRAINING Introduction to Terrorism Terrorist Operations Individual Protective Measures Surveillance Detection Hostage Survival THREATCON Measures GTA 19-4-3 Individual Protective Measures
4
Figure 4 PLANNING Unit Physical Security Plan Bomb Threat Plan
5
Figure 5 PHYSICAL SECURITY PLAN A Comprehensive Written Plan Providing Proper and Economical Use of Personnel, Land, and Equipment to Prevent or Minimize Loss or Damage From Theft, Misuse, Espionage, Sabotage, and Other Criminal or Disruptive Activities.
6
Figure 6 BOMB THREAT PLAN Control And Operation Evacuation Search Finding The Suspected Bomb Disposal Detonation And Damage Control Control Of Publicity After-Action Report
7
HARDEN THE TARGET Figure 7
8
Figure 8 TYPES OF FENCES Chain Link Barbed Wire Concertina General Purpose Barbed Tape Obstacle (Razor wire)
9
Figure 9
10
Figure 10
11
Figure 11 CLEAR ZONES Free of All Obstacles, Topographical Features, and Vegetation Exceeding 4 Inches in Height Which Reduce the Effectiveness of the Physical Barrier, Impede Observation, or Provide Cover and Concealment of an Intruder. When Possible, Should Extend 20 Feet Outside and 50 Feet Inside.
12
Figure 12
13
Figure 13
14
Figure 14 VEHICLE BARRIERS Cement Blocks Vehicle Tires Earthen Excavations Hedgehogs Log Cribs 55 Gallon barrels
15
Figure 15 CONCRETE Jersey Barrier Large Flower Pots Concrete Masonry Units
16
Figure 16
17
VEHICLE TIRES Figure 17
18
Figure 18 EARTHEN EXCAVATIONS Earthen Excavations Are Cuts Made In The Earth Surface Approximately 13 To 20 Feet Wide and 5 feet Deep. “V” Cut Excavation Triangular Cut Excavation Trapezoidal Cut Excavation
19
HEDGEHOG TETRAHEDRON ANGLED POST Figure 19
20
LOG CRIBS Figure 20
21
BELT OF LOG POSTS Figure 21
22
SERPENTINE Figure 22
23
STAND-OFF WEAPONS ATTACK Figure 23
24
STAND-OFF DISTANCE BARRIERS AT THE STATE DEPARTMENT Figure 24
25
THE JOHANNESSBURG SUNDAY STAR RAN THIS HEADLINE: “PLASTIC SAVES HUNDREDS FROM DEATH IN SA’S BIGGEST BOMB BLAST.” WINDOW FILM SAVES LIVES IN BOMB BLAST Figure 25
26
LIGHTING Figure 26
27
Figure 27 CONTINUOUS LIGHTING GLARE PROJECTION CONTROLLED SURFACE
28
GUARD FORCES Figure 28
29
GUARD FORCE EQUIPMENT Figure 29
30
Figure 30 GUARD FORCE WEAPONS Authorized by Installation Commander Standard Issue (No POW’s) Establish Procedures for Control and Accountability
31
Figure 31
32
Figure 32 VEHICLES Sufficient to accomplish mission Adequately equipped Properly maintained
33
Figure 33 COMMUNICATION Vehicle Radios Handheld Radios Consider Secure Voice
34
Figure 34 TRAINING Movement procedures Responsibility and authority OPSEC Vehicle maintenance IDS operations First aid and fire control Weapons maintenance Use of force
35
Figure 35
36
Figure 36 COORDINATING INSTRUCTIONS Implement field expedient measures using material available on site. Establish Clear zones Request engineer support
37
REVIEW AND PREPARE FOR TEST Figure 37
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.