Download presentation
Presentation is loading. Please wait.
Published byAlexander Brown Modified over 9 years ago
1
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona 12-15 May 2003 1 “ System Interfaces for Distribution Management “ TC57 WG14 Standards IEC 61968 IEC Standardisation efforts: Facilitate A2A and B2B integration for Electric Utilities in planning, constructing, maintaining and operating the T&D network
2
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona 12-15 May 2003 2 Current difficulties at Utilities Confined business functions Large amount of data Frequent changes Manual data exchanges that are error prone No link between Technical and Commercial systems Utilities are seeking for more automation of their business processes 4
3
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona 12-15 May 2003 3 Robust and reliable integrated solution Shared development costs Faster implementation Easier maintenance (incl. QA policy) Better control on technical and financial risks Configurable, scalable and vendor neutral Objectives of a 61968 based solution
4
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona 12-15 May 2003 4 Conditions for System Integration Common understanding Common language Enabling technologies Business process driven solutions (not technology driven) Requires joined expertise in UT Business, in UT Engineering, in Data Modelling and in IT 4
5
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona 12-15 May 2003 5 Interface Reference Model
6
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona 12-15 May 2003 6 Information Presentation User Interaction Archive Applications Remote Control sites Domain Object Repository System Configuration Exchange between different systems of multiple suppliers Bulk import/export Field resources System & process objects Standards IEC 61970-301 Common Information Model
7
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona 12-15 May 2003 7 CIM XML Doc 1 Participant A Participant B Import Export Power Flow 1 Solution 1 2 CIM XML Doc 2 3 4 CIM XML Doc 3 5 6 Solution 2 7 CIM XML Interoperation Tests Performed by a dozen of solutions and services providers, and Utilities, under the auspices of EPRI
8
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona 12-15 May 2003 8 1. Business Process Analysis 2. Use Cases 3. Logical Data Model 4. Message Type Definitions 5. Information Exchange Models 6. Application Interfaces IEC 61968 Methodology
9
G. Suter CH Session 3 – Block 2 – 4 th Question Barcelona 12-15 May 2003 9 IEC 61968 incorporate a large expertise « Head start » for faster integration projects Solid framework for solution’s entire lifecycle Ascertains re-usable components Reduces risks and TCO of integration projects Yes, IEC 61968 will play a main role in communication between DM and other systems Conclusions
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.