Download presentation
Presentation is loading. Please wait.
Published byNoel Owen Modified over 9 years ago
1
Web Advisory Committee 2010-11-17
2
Overview CMS Project Status Update Major work underway Timelines (high level) Blogging capability Events-calendar capability Faculty kit Revision control system Drupal 6 selected User-interface design Project communications
3
Timelines (high level) 1.Pilot implementation – complete Sep 2011 –Drupal configuration to support uWaterloo websites –4 pilot websites –Training & support plan –Implementation plan for rollout 2.University rollout – starting Sep 2011 –Engineering 1 st early adopter –Other faculties after Engineering
4
Blogging capability Driver - Daily Bulletin; feeds to uWaterloo main XHTML/CSS mock-up – completed Oct 8 2010 Drupal iteration 1 – completed Nov 1 2010 Drupal iteration 2 – deadline Nov 30 2010 –Additional required functionality (adding images, WYSIWYG editor, etc.) –Preliminary user testing to commence on Dec 1 2010 Future uses and other university examples
5
Events calendar Drivers uWaterloo main and faculty feeds Single data source (errors in copied event information) Shift to development and maintenance by full-time staff Tasks Rapid prototype Drupal 6 – completed Oct 26 2010 Needs assessments (focus groups and surveys) – completed Oct 29 2010 Analysis of findings (summary report) – completed Nov 5 2010 Requirements definition – deadline Nov 19 2010
6
Faculty kit Faculty kit – complete by Sep 2011 First early adopter – Engineering Kick-off meeting – Nov 9 2010 Project charter and PM plan underway Test kit with one faculty then rollout Input from faculty representatives Communications via blogging capability
7
Revision control system Revision Control System (RCS) = Subversion SVN Ready for use – Oct 29 2010 Team use – started Nov 1 2010 Future functionality, collaboration, agility
8
Drupal 6 selected Evaluated Drupal 6 & 7 – Sep to Oct 2010 Selected Drupal 6 – Oct 28 2010
9
User-interface design Content types (pilot sites) - websites capability –Types defined, fields defined, UI mock-ups created (Visio) –Shared set for use across university websites (some unique) –Preliminary prototypes in Drupal 6 – started this week –Accessibility testing of prototypes (throughout pilot) – start date TBD –Preliminary end-user testing (once solid prototypes in place) – date TBD –Iterative approach will be used WYSIWG editor – blogging capability -> websites capability – Customizing (accessible web content) Administrative interface –Assess options (team evaluating various interfaces) –Customization (for usability and accessibility) Accessibility consulting
10
Project communications Upcoming presentations WatITis – CMS project - Dec 7 2010 Accessibility seminar – guest speaker - Dec 10 2010
11
Questions ?????
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.