Presentation is loading. Please wait.

Presentation is loading. Please wait.

Arc Hydro for SFWMD Hydroperiod Estimation Operations Decision

Similar presentations


Presentation on theme: "Arc Hydro for SFWMD Hydroperiod Estimation Operations Decision"— Presentation transcript:

1 Arc Hydro for SFWMD Hydroperiod Estimation Operations Decision
Support System Existing Arc Hydro Framework Enhanced Arc Hydro Framework for South Florida Regional Simulation Model Flood Hydrology & Hydraulics

2 Hydrologic Information System
Analysis, Modeling, Decision Making Arc Hydro Geodatabase

3 Arc Hydro Framework Input Data
Watersheds Waterbody Streams The Arc Hydro Framework is a simplified version of the full Arc Hydro data model designed for an entry level user who just wants to put together a basic data set for streams, watersheds, waterbodies and hydro points like stream gages and water quality monitoring points Hydro Points

4 Arc Hydro Framework Data Model
The Arc Hydro framework is built on a Hydro Network made up of HydroEdges (stream lines) and HydroJunctions (points of interest on the lines). The watersheds, waterbodies and hydropoints are connected to the hydronetwork using relationships with the hydro junctions (blue lines in the diagram).

5 Extended Arc Hydro Framework
1 Hydro network 1 1..* HydroEdge HydroJunction Structure 1..* 1 Subtypes 1..* Water body Uncontrolled Controlled Subtypes 1..* MonitoringPoint Canal Segment Lake Marsh Tidal 1..* Basin 1 Time Series Raster Series 1..* HydroElement Attribute Series Feature Series

6 Arc Hydro Framework For South Florida
Basins Waterbody (NHD) The Arc Hydro Framework is a simplified version of the full Arc Hydro data model designed for an entry level user who just wants to put together a basic data set for streams, watersheds, waterbodies and hydro points like stream gages and water quality monitoring points Hydro Points Hydro Network (NHD)

7 Operations Decision Support System
A WCU is a body of water that is surrounded by control structures Goal of the Operations Decision Support System: to control the hydraulic head and water flow in water control units (WCU’s) in a satisfactory manner

8 Operations Decision Support System
Water Control Network WCULink 1 1..* WCUNode StructureLink 1..* 1 1..* 1 1 Water body Basin Structure Extended Arc Hydro Framework

9 ODSS Prototype Prototype developed by Alicia Fogg and
Gil Strassberg at CRWR 9 Water Control Units Based on an earlier prototype by ATS

10 ODSS Schematic Network
WCUNode Type 1 – WCU 2 – Structure 3 - Basin WCULink Type 1 – Water system 2 – Land to Water

11 ODSS Network Upstream Trace
Demo of ODSS Prototype: ODSS.mxd

12 Regional Simulation Model
RSM Schematic Network 1 RSM Schematic Node RSM Watermover RSM Schematic Link 1..* 1 1..* Pseudocell RSM Boundary 1 1 1..* 1..* 1..* 1 HydroElement (RSM Mesh) 1 Attribute Series 1..* 1 HydroJunction HydroEdge MonitoringPoint Extended Arc Hydro Framework

13 Existing RSM Models Goal – to simulate the distribution in
space and time of hydraulic head and water flow in surface water, shallow groundwater and canal systems under alternative management policies. North Palm Beach SWFFS Time horizon is in daily time steps summarized monthly continuing for years Southern Everglades South Dade

14 North Palm Beach Model Triangular Mesh drawn within basin boundaries.
Canals can bound cells or cross them

15 Hydroelements in 3D

16 Multipatch DEMO: ODSSMESH.mxd MultipatchforODSS.sxd
A multipatch is a volume built by joining surfaces. Each layer is a set of multipatchs developed from the original triangular mesh DEMO: ODSSMESH.mxd MultipatchforODSS.sxd

17 Flood Modeling and Managment
Goals: Flood management in the District Flood evaluation for CERP Flood mapping for FEMA C-4 Basin is a sample study region C-4

18 C-4 Basin Drainage areas defined within basin More structures
Same base hydro network Flood simulation models in XP-SWMM Short time horizon of events (~ 3 days)

19 XP-SWMM Model

20 XP-SWMM Components Stormwater storage Watershed Runoff
Groundwater inflow Channel Flow

21 Hydrology and Hydraulics
Model Basin/Drainage/Rainfall Tables H&H Schematic Network 1 H&H Schematic Node 1..* Catchment (Sub-Basin) 1 1 Drainage Line (Flowpath) H&H Schematic Link 1 Attribute Series Basins Time Series 1 HydroJunction HydroEdge MonitoringPoint Extended Arc Hydro Framework

22 HydroPeriod Tool Goal – determine the time pattern of inundation over a selected spatial region and statistically summarize that pattern 21 stage gages Geospatial interpolation of water surface elevation

23 Flood Inundation Region
HydroPeriod Flood Inundation Region 1 Depth Class Land Category dbHydro 1 1 Feature Series Time Series MonitoringPoint Attribute Series Raster Series 1..* Extended Arc Hydro Framework

24 Hydroperiod Tool TimeSeries Framework
Feature Series Time Variable 1 3 Attribute Series Raster Series y t x 2 4

25 SFWMD Nexrad data Attribute series Display as a temporal
layer in Tracking Analyst DEMO: Nexrad.mxd

26 Ponded Water Depth Kissimmee River June 1, 2003


Download ppt "Arc Hydro for SFWMD Hydroperiod Estimation Operations Decision"

Similar presentations


Ads by Google