SUMMER 2015 DEFERRED MAINTENANCE
MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT
2
MOLALLA HIGH SCHOOL HVAC REPAIRS 2015
REPLACED BELTS ON A/C UNIT 3 REPAIRED GYM UNIT COMPRESSOR REPAIRED COOLING TOWER PUMP REPAIRED GIRLS LOCKER ROOM UNIT ECONOMIZER REPLACED VARIABLE SPEED DRIVE IN A/C UNIT 1 REPLACED BELTS ON A/C UNITS 1 AND 2 REPLACED SHAFT ON A/C UNIT 2 REPLACED SUPPLY MOTOR FOR RTU 8 REPLACED RETURN MOTOR, BEARINGS, AND SHAFT FOR RTU 2 REPLACED COMPRESSOR ON DRY SYSTEM IN CANOPY AREA REPAIRED PUMP ON RTU 8
3
HIGH SCHOOL NEW STEAM OVEN AND FILTER SYSTEM
4
HIGH SCHOOL OLD BOOSTER HEATER AND NEW BOOSTER HEATER
5
NEW LED FIXTURES FOR STAFF/ATHLETIC PARKING LOT AT HS
6
MOLALLA ELEMENTARY CARPET
7
HALLWAY AND LIBRARY
8
POD AND HALLWAY
9
MES PAVING UPPER PARKING LOT AND WALKWAYS
10
SEALED BUS LANE AT MES
11
MIDDLE SCHOOL EIGHTH GRADE WING EXTERIOR BLINDS FOR TEMP. CONTROL
12
MIDDLE SCHOOL BOYS LOCKER ROOM PAINTING
13
MIDDLE SCHOOL GIRLS LOCKER ROOM BEFORE
14
AND AFTER
15
NEW SIDEWALK AT MULINO-AROUND THE FRONT TO THE WEST ENTRANCE
16
MULINO DRAINAGE WORK PREP
17
MULINO DRAINAGE WORK AFTER
18
RURAL DELL HALLWAYS PAINTING
19
NEW SINKS AND FAUCETS AT RURAL DELL
20
RURAL DELL LOCKER ROOM REMODEL FOR SUPPORTED ED CLASSROOM
21
ROOFING AT RURAL DELL
22
RURAL DELL AND CLARKES NEW PRESSURE TANKS
23
CLARKES BOILER TRANSFORMER BEFORE AND AFTER REPLACEMENT
24
New phone system handsets
25
Main server at district office and intercom speaker
26
Football field homecoming 2015