Download presentation
Presentation is loading. Please wait.
Published byArline Dortha Gilmore Modified over 9 years ago
1
Korea Connectathon 2011 Briefing Kyungpook National University IT Building #4 Room #106
2
Agenda 7.11 Welcome –Greetings –Introductions –Logistics –Test Partners, Monitors & Issue Resolution Schedule –Monday A.M. –Setup & Orientation P.M. –Complete: Consistent Time (all) CDA: PHMR & XDS-MS (Discharge) Start: DEC 1:1 XDS.b: Repository - Registry
3
Test Result Files 7.11 FTP Directories –ftp://ftp.ihe.net/International/Korea/2011_Connectathon/ –Log files, message exchanges, documents, etc. –Upload test result files when complete –Archive / delete files that do not pass the test File name convention –IHE-K-Conn-2011- - - -.doc /.pdf / … –Example: IHE-K-Conn-2011-UCareSoft-XDS.b-Registry-ITI-18.doc
4
Consistent Time 7.11 Consistent Time Server URL: www.KRISS.re.kr/2010/standard/12.html Note: Microsoft server not accurate! Test: Show wrong time (but not too wrong!) Show sync w/ time server Show time from both the server + the system (Optional) Save screen shot showing synchronization
5
PCD DEC Testing 7.11 1:1 Test Review –Multiple Parameters / 2 patients –NIST Static Message Validation –Broken DOR link test –New messages w/ different parameter values System status? –Ready to go?! Questions & Answers
6
CDA Document Testing 7.11 Document testing: –NIST R2 & IHE Profile (XDS-MS or PHMR) –Content Testing –Dynamic generation –Complete Monday if possible! System status? –Ready to go?! Questions & Answers
7
XDS.b Testing 7.11 System status? –Discuss progress and outstanding issues –Strategy for Repository + Registry + Consumer Questions & Answers
8
ATNA Testing 7.11 System status? –Discuss strategy for starting ATNA support Questions & Answers
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.