Presentation is loading. Please wait.

Presentation is loading. Please wait.

AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.

Similar presentations


Presentation on theme: "AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010."— Presentation transcript:

1 AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010

2 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 2 Outline > Hardware Developments  HCAL Base Board (HBAB)  HCAL Analogue Board (HAB)  HCAL Testboard > System Commissioning  Cable Interfaces  Safety > Circuit Details  Slow Control Loading  Analogue Readout Path > Light Calibration System (ASCR Prague) > System Setup

3 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 3 System Electronics Setup > Two types of HBABs realized: ‘Left’ and ‘Right’. > One HBAB reads out up to 108 detector channels (SiPMs).

4 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 4 HCAL Analogue Board (HAB) Analogue Line Drivers Temperature Monitor Analogue Test Output (Gain=0.5 in 50  ) Reference Voltage Slow-Control Settings (Param. Shift Reg) ASIC Connector to HBAB (18 channels) 576 Boards produced.

5 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 5 HCAL Base Board (HBAB) Detector Interface (SiPMs) POWER (Sub D) & DAQ (SCSI) Interfaces Type Def. HAB Bypass Jumper LED System Control (2 diff lines) 100 boards produced (50 of each type)

6 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 6 SiPM to HBAB interconnection Coaxial cable interconnection (Bias-V on cable shield)

7 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 7 HCAL Testboard CMB Control POWER Input Charge Injection 18 SiPM Inputs (SiPM Bias+Signal) HAB Test Outputs (SRIN, TCALIB) DAQ Interface Charge Injection 2 Boards available

8 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 8 Cabling and Safety 68-pin SCSI DAQ connector 9-pin Sub D Power connector Up to +100V (DC) SiPM Bias voltage on all HCAL boards on open traces

9 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 9 HAB Parameter Configuration (Slow-Control) Step 1 : SW_DAC=1 : Load ASIC DAC SR, 18 x 8 bits per HAB, 864 bits per HBAB for 6 HABs Step 2 : SW_DAC=0 : Load external SR, 16 bits per HAB, 96 bits per HBAB for 6 HABs

10 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 10 HAB Analogue Output Stage From ASIC analogue output AD8051 G=1 Ref.-Voltage 1.2V LM4051 Line Driver AD8131 G=2 To CRC ADC input 120  terminated Backward termination 56  on each line Line Driver AD8131 G=2, Test Outp. 50  Lemo Test Output in 50 

11 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 11 Light Calibration System > Calibration and Monitoring of the non-linear detector response > Based on UV LEDs and light distribution by fibers (one fibre per channel). > CAN bus controlled by an extra PC. > Light output monitoring by PIN-diode readout (with HBABs and HABs) > Module Name: “Calibration and Monitoring Board” (CMB) Developed by our Prague colleagues (ASCR Prague)

12 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 12 Light Calibration System CMB

13 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 13 System Setup – Signal Chain PIN Readout Crate One crate for all layers DAQ (CRC) for all layers

14 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 14 System Setup – Slow Control / Power picture by Erika Garutti Temp.-Sensor

15 Mathias Reinecke | Tungsten HCAL meeting | March 2nd, 2010 | Page 15 Conclusions > Schematics of all boards can be provided (email address?)! > Simply contact us whenever support is needed! Link to Manual (HCAL electronics): http://adweb.desy.de/~reinecke/HCAL_Manual5.pdf http://adweb.desy.de/~reinecke/HCAL_Manual5.pdf


Download ppt "AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010."

Similar presentations


Ads by Google