Active Buffer Status in CBM DAQ W. Gao, A. Kugel, R. Männer, G. Marcus, M. Stapelberg, A. Wurz 06 Oct 2009 14th CBM Collaboration Meeting Split.

Similar presentations


Presentation on theme: "Active Buffer Status in CBM DAQ W. Gao, A. Kugel, R. Männer, G. Marcus, M. Stapelberg, A. Wurz 06 Oct 2009 14th CBM Collaboration Meeting Split."— Presentation transcript:

1 Active Buffer Status in CBM DAQ W. Gao, A. Kugel, R. Männer, G. Marcus, M. Stapelberg, A. Wurz 06 Oct 2009 14th CBM Collaboration Meeting Split

2 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg2 Agenda Test set-up and traffic classes Hardware preparation –ABB DMA logic improvement –Larger Event Buffer: DDR FIFO –Optical Link (Frank, CA Group, ZITI) Software preparation –ABB Daemon –Misc. test programs Performance tests

3 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg3 Test Set-up ABB2 ROCs

4 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg4 Traffic Classes in Link Protocol DAQ –Hit data packet –Uni-directional: downstream –Major data flow CTL –Commands and responses –Bi-directional DLM (Deterministic Latency Message) –Timing purpose –Synchronization

5 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg5 ABB2 Block Diagram DDR2 SFP-0 SFP-1 ABB2 4x PCIe V5LX110T LP FIFO wrapper DMA Fibre BRAM FIFO BRAM DGenIGen xbar (CAG)

6 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg6 DMA Upgrade Interface upgrade –32-bit to 64-bit –Back-to-back transactions BAR[2] access bugs Time-out’s –DMA time-out: does nothing –Event Buffer time-out: padding with -1 –Tx arbitration time-out: padding with -1

7 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg7 DDR FIFO Reason –128 KB BRAM FIFO is a little too small to avoid data loss Size –256 MB = 64 bits × 32M Peak bandwidth –8B × 2 × 125 MHz = 2 GB/sec Behaves as standard FIFO (not FWFT yet) –Reset takes longer time (3.6 ms) than normal FIFO Data count issue –Disagree between count and empty flag crashed the host

8 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg8 Optical Link Module (CAG, ZITI) 2.5 Gbps / link Both for ABB2 and ROC Protocol –packet-based Combining 2 links outputs in ABB2 –Additional XBAR module for ABB2

9 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg9 ABB Daemon

10 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg10 ABB Daemon ( cont’d ) Uses UNIX IPC mechanism A transparent replacement for direct driver usage Control requests have a higher priority than data transfer Takes care of the concurrent access of the device by multiple software pieces Provides a high-level interface of network messages for the ROC –PUT, GET, NPUT, NGET, … Provides a DMA interface for the FIFO read Minimal overhead

11 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg11 and, with all these …

12 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg12 Commissioning Tests (nXyter –) ROC – DCB – ABB2 – ABB Daemon – upper-level test programs Data generators available at two positions –ABB2: without optical links –ROC: with optical links Loop-back –inside ABB2 before asymmetric DAQ channel –inside DCB: CTL verification in this way Traffic class tests status –CTL: no error –DAQ: no error. Much more effort than CTL –DLM: primarily tested 2 ROCs are also tested –Connected to ABB2 Software support –PCI Driver + MPRACE Library + ABB Daemon + testNXyter

13 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg13 CTL Message Latency Tests Write-ReadRead Latency (mSec)0.1380.053 Software layer 2 tests are made –Read latency –Read-after-write latency

14 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg14 DAQ Performance DMA Read Perf. DDR FIFO (large) BRAM FIFO (small) 1-ROC272.7 MB/s199.2 MB/s 2-ROC308.1 MB/s305.8 MB/s ROC DGen data source –Instead of nXyter format Software layer –Instead of data-link layer

15 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg15 Status Summary Hardware upgrade –DMA transportation –256 MB DDR FIFO –CAG.ZITI: Optical link + XBar Software –ABB Daemon –nXyter-format data source DMA read test “United” tests in stability –DCB-ABB2 for CTL robustness test –ROC-ABB2 –2 ROCs - ABB2

16 06.10.2009 CBM[14] Split Wenxue Gao ZITI.Uni-Heidelberg16 End of Talk