Download presentation
Presentation is loading. Please wait.
Published byMarian Murphy Modified over 9 years ago
1
WP3 Quality Steve Fisher / RAL 25/9/2003
2
WP3 Steve Fisher/RAL - 4/9/2003R-GMA2 Code Problems –Unit tests are not enough –WP3 testbed is currently too small to find some of our problems –Delays in getting things installed Solutions –Unit tests are cheap – so write a lot –Should we go for less sites but with multiple CE and SE per site? –We need the resilience framework. –Don’t introduce a major change before a previous one has been fully tested on a significant testbed. –Don’t release code just before going on holiday
3
WP3 Steve Fisher/RAL - 4/9/2003R-GMA3 Performance Problems –See Antony’s talk –Must have alarms set up –Must be totally automatic Solutions –See Antony’s talk
4
WP3 Steve Fisher/RAL - 4/9/2003R-GMA4 Documentation Problems –How to keep it up to date –How to make sure it is useful Solutions –Ensure that bugs are submitted to Bugzilla
5
WP3 Steve Fisher/RAL - 4/9/2003R-GMA5 Support / Skills Problems –Ideally we would all be experts at everything and totally interchangeable “black boxes” –Jacks of all trades –People leave, are ill, take holidays Solutions –Revisit skills matrixskills matrix
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.