1
Structures Team Team Leader: Jonathan Piccoli Secretary: Nicholas Baker Think Tank Lead: Daniel Morehouse CAD Lead: Parth Patel Design Report: EDSGN 100 Design Project 1
2
The Structure Team’s Mission Statement. To design and build economically sustainable, educational, entertaining tech exhibit at ACM as part of SAIN’s tourist circuit to create interest and generate economic activity in the south central PA and MD area.
3
Table of Contents The Design Process Opportunity and Problem Space Specifications Brainstorming and Analysis Solution Examples Summary Appendices
4
The Opportunity was to design a portion of a self- sustaining circuit using educational tools based on the STEM disciplines. South Central PA needs more money spent in their area on tourism Must educate the customer in STEM disciplines Must use structures in the education process Located near ACM as part of S.A.I.N.’s loop
5
From the opportunity we recognize the consumer needs and specifications. The Customer Specifications Safe for everyone Is User Friendly Easy to Setup Software is interactive Is visually appealing The Engineering Specifications In a 14’ x 14’ exhibit footprint Have 4 computers in the exhibit Enough K’Nex for 8 children at a time
6
Brainstorming: The ideas we chose. #1 Computer Bridges #2 K’Nex Building #3 Computer Demonstration
7
The Exhibit Area All computers have access to both programs Touchscreen technology K’Nex area for building bridges With drawers filled with different parts
8
This presentation’s most important points.
9
PowerPoint: References http://www.knexusergroup.org.uk/acatalog/K78640model4.jpg http://www.pbs.org/wgbh/buildingbig http://www.culturaltravelguide.com/wp-content/uploads/2012/03/rollercoaster-islands-of-adventure-hulk-2.jpg http://www.geekshow.us/wp/wp-content/uploads/2009/04/world_of_goo_pipe.jpg http://www.100placestotravel.net/wp-content/uploads/2013/02/san-francisco-golden-gate-bridge.jpg http://amolife.com/image/images/stories/AroundTheWorld/bridges.jpg http://cdn2.ubergizmo.com/wp-content/uploads/2013/11/chinese-bridge.jpg http://www.willowboats.com/washnton/tyne%20bridge.JPG http://www.exponent.com/files/Uploads/Images/toxicology/chemical%20bonding.jpg http://earthquakes.unlv.edu/outreach/Shake%20Table.JPG www.google.com/maps
10
Brainstorming: The ideas we rejected.
11
Operational and Maintenance Issues Computer replacement cost Replacement parts for K’Nex K’Nex will require sorting and cleanup daily
12
Gantt Chart Task NameDurationStartFinishPredecessors Phase #18 daysWed 1/22/14Fri 1/31/14 Begin Project1 dayWed 1/22/14 Identify the Problem3 daysWed 1/29/14Fri 1/31/142 Define Problem Space/Gather Information7 daysMon 2/3/14Tue 2/11/141 Define Constraints2 daysMon 2/3/14Tue 2/4/14 Specifications4 daysWed 2/5/14Mon 2/10/145 Ideas Ideas Ideas8 daysSun 2/16/14Tue 2/25/144 Brainstorm2 daysMon 2/17/14Tue 2/18/14 Pugh Chart of all ideas2 daysWed 2/19/14Thu 2/20/148 Evaluate3 daysFri 2/21/14Tue 2/25/149 Technical Report5 daysThu 2/27/14Wed 3/5/147 CAD Best Ideas2 daysThu 2/27/14Fri 2/28/14 Project Overview2 daysThu 2/27/14Fri 2/28/14 Cost Estimates2 daysThu 2/27/14Fri 2/28/14 Presentation5 daysThu 2/27/14Wed 3/5/1411 PowerPoint3 daysThu 2/27/14Mon 3/3/14 Verbal Speech3 daysFri 2/28/14Tue 3/4/1416 Topic Outline Sentence Outline Speech Practise1 dayTue 3/4/14 17 NoteCards1 dayTue 3/4/14 16,17 Final Presentation to SAIN1 dayWed 3/5/14
13
Brainstorming Ideas
14
Pairwise
15
Matrix
16
Concept Sorting
17
Cost Estimate and Expenses Startup cost $3000 Operating cost Annually $50 Once every 4-6 years computer replacement/ upgrade $1300 Total: 8-12 (Can be scaled up for more people) Computers: 4 Building: 4-8
18
Mission Statement Graphic