Download presentation
Presentation is loading. Please wait.
Published byCordelia Gilbert Modified over 9 years ago
1
ENGR 2213 Thermodynamics F. C. Lai School of Aerospace and Mechanical Engineering University of Oklahoma
2
Cogeneration Process Heat Pump Boiler Process Heater Thermal energy that is required by some industries. Process heat is usually supplied by steam at 5-7 atm and 150-200 ºC. Industries that use large amount of process heat also consume a large amount of electric power.
3
Cogeneration Cogeneration is the production of more than one useful form of energy from the same energy source. Turbine Pump Boiler Process Heater
4
Cogeneration Optimum Condition 1 2 3 7 4 5 6 8 Condenser Turbine P 1 P 2 Boiler Process Heater Expansion Valve m 4 = m 6 m 5 = m 7 = 0
5
Cogeneration No Load 1 2 3 7 4 5 6 8 Condenser Turbine P 1 P 2 Boiler Process Heater Expansion Valve m 5 = m 6 = 0
6
Cogeneration Peak Load 1 2 3 7 4 5 6 8 Condenser Turbine P 1 P 2 Boiler Process Heater Expansion Valve m 4 = m 5
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.