Download presentation
Presentation is loading. Please wait.
Published byRoland Grant Modified over 9 years ago
1
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: 2015-09-07 to 2015-09-11 Agenda Item: TP19, Item 10, Reports from Working Groups TP-2015-0834-WG6_TST#19_status_report
2
Items for INFORMATION Draft output of TST ad-hoc sessions on oneM2M certification Q&A (TP-2015-0818R01) The Q&A slides will be submitted to SC or SC Certification Ad-Hoc for their information Any comments are welcome!! TP-2015-0834 2
3
Items for INFORMATION 1 st oneM2M Interoperability Test Event: – Participants: 22 companies with DUT (Device Under Test) – Organization: ETSI & TTA – Date: after TP #19 (14.Sep ~ 16.Sep) – Scope: HTTP, CoAP and MQTT bindings interoperability – Location: ETSI – Report will be available after the event TP-2015-0834 3
4
Items for INFORMATION Call for Interoperability Events: – Regular oneM2M Interoperability Events (twice in a year) – TTA&ETSI kindly volunteer to host 2 nd Interoperability Event on May 2016 (before or after TP) – Plan to have multiple regional/vertical interop. events – Please contact the TST leadership to discuss interoperability events TP-2015-0834 4 1 st 2 nd 3 rd 4 th 6 th Regular events Regional Verticals 201520162017
5
Items for INFORMATION Meeting objectives summary Prepare 1 st oneM2M Interoperability Event DONE Handle input documents to TS-0013 DONE Handle input documents to TS-0015 & TS-0017 & 0018 DONE Consensus on the Test Purpose format and its contents DONE Feedbacks on the addressed technical questions of certification issues DONE Handle input documents to Application Developer TR DONE TP-2015-0834 5
6
Highlights Improve the maturity of TS-0013 (interoperability testing) enough to be used for "1st oneM2M Interoperability Event" next week. (95%) Plan to freeze on TST #20 Good progress on the template for Test Purpose and Application Developer Guide TR A consensus on a template for describing Test Purposes Application developer guide (skeleton, use case, and high level architecture) TP-2015-0834 6
7
Next Steps Keep improving the maturity of TS-0013 (Interop.) and freeze it on TP #20 Keep working on developing conformance test specifications in particular PICS and TSS&TP Provide a summary of feedbacks from different member companies on certification related technical questions to SC Certi-Ad-Hoc Prepare input contributions after the Interop. event if issues are identified TP-2015-0834 7
8
Action Items Status #Action Item DescriptionOwnerStatus A-WG6-TP18-001CRs to reflect the latest agreed test description Jiaxin Yin, Bob Flynn, Mahdi Ben Alaya, Laurent Velez DONE A-WG6-TP18-002Collect feedbacks on certification related technical questions JaeSeung SongDONE A-WG6-TP18-003Investigate TS-0008&0009 v1.2.0 vs v1.1.0 Bob FlynnDONE TP-2015-0834 8
9
Next Meetings / Calls Conference Calls – TST#19.1: 01. Oct, 2015, UTC 13:00-15:00 – TST#19.2: 27. Oct, 2015, UTC 13:00-15:00 Face-to-Face – 1st Interoperability Event: September 14-16, Sophia Antipolis, France – TST#20.0: November 09-13, Beijing, China TP-2015-0834 9
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.