Download presentation
Presentation is loading. Please wait.
Published byOphelia Cannon Modified over 9 years ago
1
Muon Trigger Status Report Eric James Trigger Commissioning Workshop 8/17/00
2
TDC Status
3
Paddle Card Status zCMU-CMP (38) y30 in hand, 13 awaiting modification zCMX (24) y02 in hand, 28 awaiting parts and assembly zBMU-BSU-TSU-CSP[T+B] (34) y16 in hand, 13 awaiting parts and assembly zCSX-CSP[N+S]-CLC (13) y25 additional boards on order
4
Mezzanine Card Status zDelta-T Mezzanine Card yCMU,CMX,BMU yAll 80 boards in hand and tested. zScintillator Mezzanine Card yCSP,CSX,BSU,TSU,HAD yAll 40 boards in hand. Still to be tested. zCMP Mezzanine Card y2 production boards and some prototypes in hand. y14 more production boards due from ADCO.
5
Trigger Card Status zMatchbox Card yAll 15 production boards are in hand. zPre-Match Card y2 production boards in hand and under test. y4 additional boards still due from ADCO. zMuon Trigger Summary Card y2 production boards in hand. zMatchbox Transition Card y2 prototype boards in hand. y15 production boards still due from ADCO.
6
ADCO Delivery Schedule z14 CMP Mezzanine Cards y9/15/00 z04 Pre-Match Cards y9/29/00 z15 Matchbox Transition Cards y10/13/00 zRecent TDC deliveries indicate potential slippage on the order of a couple weeks.
7
September 1st zExpect Matchbox installation and trigger cabling will be complete. yCMU - 360 degree coverage both ends. yCMP/CSP - Top and bottom coverage. yCMX/CSX - 180 degree coverage one end. yIMU - 60 degree coverage one end. yTrack Match - 60 degree coverage.
8
November 1st zAdditional hardware added as available. yCMU - 360 degree coverage both ends. yCMP - Top,Bottom, and South wall coverage. yCMX/CSX - 360 degree coverage one end. yIMU - 360 degree coverage one end. yTrack Match - Dependent on TDC availability.
9
Software zRun control software is in reasonable shape for the muon trigger hardware. zA first pass has been made at placing muon trigger parameters into the trigger database. zSimulation code for CMU, CMX, and CMP has been written. A framework exists for developing the hardware monitor code.
10
Commissioning Run Goals zFinalize monitoring code for muon trigger hardware. zAttempt to understand the details of timing in each of the different detector elements into the muon trigger. zCommission as much of the muon detector and the associated muon trigger hardware as possible.