A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI
2
A.Kovalenko From our SUMMARY at the 1 st meeting: JINR/GSI COLLABORATIVE R&D COVERED SET OF THE PROBLEMS CONNECTED WITH THE SIS100 FAST-CYCLED SYNCHROTRON; We consider, for example, the SIS100 MAGNETS AND OTHER LATTICE ELEMENTS (TS-2, TS-6,…) as possible contribution OF RUSSIAN INDUSTRY AND LABORATORIES, nevertheless, it should be COLLABORATIVE AGREEMENTS AT GOVERNMENTAL LEVEL Lab Directors Meeting, Darmstadt, October 1/2, 20072 nd Lab Directors Meeting, Protvino, January 15/16, 2008
3
JINR NUCLOTRON is considered as the SIS100 prototype system ring circumference -250 m
4
Indeed, the SIS100 collaborative R&D are carried out by JINR/GSI team since 2000. The list of considered problems is the following: - MODEL DIPOLES & QUADRUPOLES; - FULL LENGTH PROTOTYPES; - STEERERS AND MULTIPOLES; - LATTICE STRUCTURE; - BEAM EXTRACTION and TRANSFER; - CLOSE ORBIT CORRECTION; - U(29+) COLLIMATION; - OTHER ELEMENTS (BPM, CATCHERS); - CRYOSTAT MODULES; - COOLING SYSTEM; A.Kovalenko Lab Directors Meeting, Darmstadt, October 1/2, 20072 nd Lab Directors Meeting, Protvino, January 15/16, 2008
6
A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 SIS100 WP’s proposed to JINR by the FAIR
7
A.Kovalenko Lab Directors Meeting, Darmstadt, October 1/2, 20072 nd Lab Directors Meeting, Protvino, January 15/16, 2008