Download presentation
Presentation is loading. Please wait.
Published byLora Wells Modified over 9 years ago
1
10 December 2015 Campus Master Plan
2
10 December 2015 Draft Master Plan Concept Site Development Plan New Facilities Maintenance Building New College Center Future Building Sites Department Moves and Building Renovations Preliminary Cost Estimates Next Steps Meeting Agenda
3
Draft Master Plan Concept
4
Site Development Plan Future Retail New Campus Entrance New Facilities Maintenance Building New Campus Center Future Building Sites Future Development Area Building Legend A.Library B.Theatre C.Arts and Sciences Building D.Technology Center E.Physical Education Complex F.College Center G.Engineering and Math Building H.Future Academic Building I.Future Academic Building J.Facilities Building K.Field Support Building L.Parking Structure M.Cedar House A B C D E F G H I J L
5
10 December 2015 Site Development Plan New Facilities Maintenance Building Relocates a non- academic function away from the campus core Includes: Maintenance Custodial Grounds Mail Room Duplication A B C D E F G H I J L
6
10 December 2015 Site Development Plan New College Center Program Array Student Services Student Life Advising Dining Conference Center Bookstore Administration from Building A Consolidate Information Technology Foundation Offices
7
10 December 2015 Long-Term Site Development Plan Retail Upper Quad Joins with existing terraced quads Links buildings along the accessible path through Campus Focal point from Route 272 and from Campus Drive A B C D E F G H I L
8
Space Allocation Summary Technology Center Home for Visual Communications Program Art Facilities relocated from Arts & Sciences Expanded Health Professions Space and Reconfigured Simulation Suite Learning Commons Library/Reading & Writing Center Early College Academy/Classrooms/Offices Arts & Sciences Building Public Safety General Classrooms, including three equipped for Distance Learning Two Computer Testing Labs
9
Theatre
10
Existing Theatre Entrance Ticketing & Offices Toilet Rooms Gallery Stage Seating Lobby is small. Toilet rooms cannot accommodate entire theatre audience. Plaza/three-story volume with complex circulation Challenges Lobby
11
Modest Addition Entrance Toilet Rooms Stage Seating Expand Toilet Rooms into existing gallery space Small addition to accommodate Ticketing and Offices Larger Lobby Refresh finishes in Lobby and Foyer Strategy Lobby Ticketing & Offices Lobby
12
Other College Sites Elkton Station General maintenance and upkeep Refurbish landscaping Consolidation of staff offices Family Education Center General maintenance and upkeep New exterior lighting fixtures Refurbish landscaping Bainbridge Center General maintenance and upkeep
13
Preliminary Cost Estimates
14
Ten-Year Master Plan Projects Technology Center Learning Commons Arts & Sciences Building Theatre Lobby Estimated Cost: $91,450,000
15
Next Steps
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.