Download presentation
Presentation is loading. Please wait.
Published byShanon Caldwell Modified over 9 years ago
1
CS 360 Lecture 16
2
For a software system to be reliable: Each stage of development must be done well, with incremental verification and testing. Testing and correction do not ensure quality, but reliable systems are not possible without testing. 2
3
Static verification testing: Techniques of verification that do not include execution of the software. May be manual or use computer tools. Dynamic verification testing: Testing the software with trial data. Debugging to remove errors. 3
4
Reviews are a form of static verification testing that is carried out throughout the software development process 4
5
Reviews are a fundamental part of good software development Team members review each other's work: Can be applied to any stage of software development, but particularly valuable to review program design or code Can be formal or informal Preparation The developer(s) provides information on components they’re building Models Specifications and design Code Participants (should) study the materials in advance. Meeting The developer leads the reviewers through the materials, describing what each section does and encouraging questions. 5
6
A review is a structured meeting Participants and their roles: Developer(s): person(s) whose work is being reviewed Moderator: ensures that the meeting moves ahead steadily Scribe: records discussion in a constructive manner Interested parties: other developers on the same project Client: representatives of the client(s) who are knowledgeable about this part of the process 6
7
Benefits: Multiple people looking at design/code. Uncover mistakes, suggest improvements Developers share expertise which helps with training Incompatibilities between components can be identified Gives developers an incentive to tidy loose ends Helps scheduling and management control 7
8
To make a review a success: Senior team members must show leadership Good reviews require good preparation by everybody Everybody must be helpful, not threatening Allow plenty of time and be prepared to continue on another day. 8
9
Concept: achieve benefits of review by shared development Two people work together as a team: design and/or coding testing and system integration documentation and hand-over Benefits include: two people create better software with fewer mistakes cross training Many software houses report excellent productivity 9
10
Formal program reviews whose objective is to detect faults Code is read or reviewed line by line. 150 to 250 lines of code in 2 hour meeting. Use checklist of common errors. Requires team commitment and trained leaders So effective that it is claimed that it can replace unit testing 10
11
Data faults: Initialization, constants, array bounds Control faults: Conditions, loop termination, compound statements, case statements Input/output faults: All inputs used, all outputs assigned a value Interface faults: Parameter numbers, types, and order, structures and shared memory Storage management faults: Modification of links, allocation and deallocation of memory Exceptions: Possible errors, error handlers 11
12
Program analyzers scan the code for possible errors and anomalies. Control flow: Loops with multiple exit or entry points Data use: Undeclared or uninitialized variables, unused variables, multiple assignments, array bounds Interface faults: Parameter mismatches, non-use of functions return value, uncalled procedures 12
13
Static analysis tools Cross-reference table: Shows every use of a variable, procedure, object, etc. Information flow analysis: Identifies input variables on which an output depends. Path analysis: Identifies all possible paths through the program. 13
14
Murphy's Law: If anything can go wrong, it will. Defensive Programming: Write simple code. Avoid risky programming constructs. If code is difficult to read, rewrite it. Incorporate redundant code to check system state after modifications. 14
15
Testing is most effective if divided into stages User interface testing (carried out separately) Unit testing unit test System testing integration test function test performance test installation test Acceptance testing (carried out separately) 15
16
Tests on small sections of a system: a single class or function Emphasis is on accuracy of code against specification If unit testing is not thorough, system testing becomes almost impossible. If your are working on a project that is behind schedule, do not rush the unit testing. 16
17
Subset of user interface testing guidelines: General Every action that alters user data can be undone. All application settings can be restored to default. The most frequently used functions are found at the top level of the menu structure. Keyboard Efficient keyboard access is provided to all application features. No awkward reaches for frequently performed keyboard operations. Provides keyboard operations for all mouse operations. Mouse No operations depend on input for middle or right mouse buttons. The mouse pointer is never restricted to part of the screen by the application. 17
18
Takes place when modules or sub-systems are integrated to create larger systems Objectives are to detect faults due to interface errors or invalid assumptions about interfaces 18
19
Interface types: Parameter interfaces Data passed from one procedure to another Shared memory interfaces Block of memory is shared between procedures Procedural interfaces Sub-system encapsulates a set of procedures to be called by other sub-systems Message passing interfaces Sub-systems request services from other sub-systems 19
20
Interface misuse A calling component calls another component and makes an error in its use of its interface e.g. parameters in the wrong order Interface misunderstanding A calling component embeds assumptions about the behaviour of the called component which are incorrect Timing errors The called and the calling component operate at different speeds and out-of-date information is accessed 20
21
The objective of path testing is to build a set of test cases so that each path through the program is executed at least once Ensures statement/branch coverage If every condition in a compound condition is considered Condition coverage can be achieved as well Steps for basis path testing: Draw a (control) flow graph using the source code Line numbers can dictate each node in the graph Calculate the cyclomatic complexity using the flow graph Determine the basis set of linearly independent paths Design test cases to exercise each path in the basis set 21
22
Flow Graphs Used to depict program control structure Can be drawn from a piece of source code Flow Graph Notation: composed of edges and nodes. An edge starts from a node and ends at another node 22
23
Binary search flow graph 23
24
Calculating cyclomatic complexity: E = number of edges N = number of nodes Number of components with exit points CC = E – N + 2P CC = 11 – 10 + 2 = 3 Independent paths through the program: 12, 1, 2, 3, 5, 6, 7, 10 12, 1, 2, 3, 5, 6, 7, 8, 7, 10 12, 1, 2, 3, 5, 6, 7, 8, 9, 7, 10 Test cases should be derived so that all of these paths are executed 24
25
Designing the test cases: Path 1 test case: 12, 1, 2, 3, 5, 6, 7, 10 Input data: [4] Expected output: 4 Path 2 test case: 12, 1, 2, 3, 5, 6, 7, 8, 7, 10 Input data: [6, 2, 5, 1, 3] Expected output: 6 Path 3 test case: 12, 1, 2, 3, 5, 6, 7, 8, 9, 7, 10 Input data: [5, 2, 1, 1, 8, 3, 4] Expected output: 8 25
26
Tests complete systems or subsystems composed of integrated components Main difficulty is localising errors Errors may not exist until components rely on each other to function properly Incremental integration testing reduces this problem 26
27
Exercises the system beyond its maximum design load. Stressing the system often causes defects to come to light Stressing the system test failure behaviour. Systems should not fail catastrophically. Stress testing also checks for unacceptable loss of service or data Particularly relevant to distributed systems which can exhibit severe degradation as a network becomes overloaded 27
28
Used to determine if the requirements of a software product are met. Gather the key acceptance criteria The list of features/functions that will be evaluated before testing the product. Determine testing approaches Types of acceptance tests: stress, timing, compliance, capacity Testing levels: system level, component level, integration level Test methods and tools Test data recording Description of how acceptance test will be recorded 28
29
29 Requirements Tests by developer PerformanceAcceptance Client’s Understanding of Requirements Test Installation User Environment Test Usable System Validated System Accepted System Tests by client
30
Error prevention (before the system is released): Use good programming methodology to reduce complexity Use version control to prevent inconsistent system Apply verification to prevent algorithmic bugs Error detection (while system is running): Testing: Create failures in a planned way Debugging: Start with an unplanned failures Monitoring: Deliver information about state. Find performance bugs Error recovery (recover from failure once the system is released): Data base systems (atomic transactions) Modular redundancy Recovery blocks 30
31
Every project needs a test plan that documents the testing procedures for thoroughness, visibility, and for future maintenance. It should include: Description of testing approach. List of test cases and related bugs. Procedures for running the tests. Test analysis report. 31
32
User interfaces need several categories of testing. During the design phase, user interface testing is carried out with trial users. Design testing is also used to develop graphical elements and to validate the requirements. During the implementa1on phase, the user interface goes through the standard steps of unit and system testing to check the reliability of the implementation. Finally, acceptance testing is carried out with users, on the complete system. 32
33
Test parts of a system which are commonly used rather than those which are rarely executed acceptance testing is based on the system specifications and requirements Flow graphs identify test cases which cause all paths through the program to be executed Interface defects arise because of specification misreading, misunderstanding, errors or invalid timing assumptions 33
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.