Download presentation
Presentation is loading. Please wait.
Published byBranden Riley Modified over 9 years ago
1
1 Land Development: Process & Technology Storm Water Planning Storm Drainage Design Storm Water Management—Quantity Storm Water Management—Quality Utilities—Wastewater Treatment Utilities—Water Distribution Utilities--Dry Utilities Erosion & Sediment Control The Site Design Process: Steps & Proc. Document Production—What & How Engineer’s/Surveyor’s Roles During Construction Final Exam September 7 September 14 September 21 September 28 October 5 October 12 October 19 October 26 November 2 November 9 November 16 November 23 November 30 Semester 2: Land Development Engineering LDE 201-213
2
2 Land Development: Process & Technology Fairfax County Sequence LDE 310 January 2011 TBD Comprehensive Plan Rezoning Zoning Players/Functions Site & Subdivision Plans Other Plans/ DPE/Peer Review Land Development Engineering LDE 300 Administrative Requirements for Plan Submission & Site Completion (ARPSSC)
3
3 Land Development: Process & Technology Land Development Engineering LDE 320 Loudoun County Sequence Dates TBD Welcome To Loudoun County Legislative Process Subdivision Process Site & Construction Plan Process Bonding Process
4
4 Land Development: Process & Technology Land Development Engineering LDE 330 Prince William County Sequence DATE TO BE DETERMINED Comprehensive Plan9:00 -10:30 AM Rezoning10:30 AM - 12 Noon Zoning1:00 - 2:30 PM Site & Subdivision Plan2:30 - 4:00 PM Legal Aspects4:00 - 5:30 PM
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.