NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle below 10%
2
NA61 11 October 2010Light Ion for NA61/ S. Maury22 Accelerators status Explanation of the second part of the schedule No particular problem for the operation of the Linac2 PSB running as a “swiss clock” since the beginning of the run until the second week of July (MPS trip, ARCON system) Magnetic field fluctuation at the PS injection and extraction for SFTPRO/CNGS beam back to old CT Few water leaks on the main magnets of the SPS repaired or exchanged Pbar production in AD up to 4.7E7 @ 3.5 GeV/c with very good extraction efficiency (Target water station tripping). Ions in good shape in the injectors: EARLY and NOMINAL beams for the LHC injected in the SPS and fragmented beam tests scheduled for the week 47 2
3
NA61 11 October 2010Light Ion for NA61/ S. Maury3 YearProgrammecomments 2010 Fragmented beam test #1 (100GeV/u, 13GeV/u, plus intermediate value)- Foreseen for week 47 2011Fragmented beam test #2: optimisation - Physics requested with up to 6 energies, 10 weeks 2012Running in source for Ar and Xe - Needs approval and decision; for now nothing runs in 2012 2013Physics with Ar - Running whole ion chain for 37 weeks(22+3+12) (include lead for LHC); startup end of March - Needs additional manpower 2014Physics with Xe - Running whole ion chain for 37 weeks (include lead for LHC); startup end of March - Needs additional manpower 2014(b)Physics with fragmented lead beam- Pushes Xe physics into 2015
4
NA61 11 October 2010Light Ion for NA61/ S. Maury4 Cycling and intensities 9 injections into SPS 9 x 4 bunches = 4.4E9 ions Yielding ~1E4 Boron fragments/spill [exactly how many is what we want to measure] – 8 x 3.6 seconds injection flat bottom Up to 8 s acceleration (for 158 GeV/u) 4.4 s extraction 2 s rampdown Total cycle 43.2 s (compare to the 15.6 s for fixed-target in the supercycle to-day, 27.6 s difference)
5
NA61 11 October 2010Light Ion for NA61/ S. Maury5 Duty cycle for NA61 CNGS supercycle duty cycle NA61 CNGS/hour 043.210%0 149.29%73 255.28%130 361.27%176 467.26.5%214 573.2(45.6)6%246(394) 679.25.5%273
6
NA61 11 October 2010Light Ion for NA61/ S. Maury6 Duty cycle with energy and half intensity Energy Duty cycle no CNGS 5 CNGS 158 15% 7% 80 18 8 20 22 9 13 23 9
7
NA61 11 October 2010Light Ion for NA61/ S. Maury7 Duty cycle for NA61(1batch) CNGS supercycle duty cycle NA61 CNGS/hour 014.430%0 120.421.5%176 226.417%272 332.413.5%333 438.411.5%375 544.410%405
8
NA61 11 October 2010Light Ion for NA61/ S. Maury8 Duty cycle with energy and only one batch Energy Duty cycle no CNGS 5 CNGS 158 30% 10% (405 CNGS/h) 80 47 11 20 78 12 13 90 12.5
9
NA61 11 October 2010Light Ion for NA61/ S. Maury9 Impact on proton users No impact on LHC (in case of LHC shutdown NA61 does physics) Positive impact on ISOLDE – Up to six PSB cycles recuperated for Isolde No impact on AD Some impact on East Hall / TOF – One 2.4s PS cycle used for ions during tests and setting up – Up to 8 additional 2.4s PS cycles used for ions during run for fragmentation Obviously North Area proton users suffer the most as proton and ions are not compatible in the North Area) – 0 week in 2010 (fragmentation test foreseen week 47-48 after proton stop) – 11 weeks in 2011 (fragmentation test + Physics) – 11 weeks in 2013 (Ar primary: SU + run) – 11 weeks in 2014 (Xe primary: SU + run) Impact on CNGS – Same number of cycles/supercycle but longer supercycle