Download presentation
Presentation is loading. Please wait.
Published byAntony Gardner Modified over 9 years ago
1
U.S. Department of the Interior U.S. Geological Survey Horizontal Datum Shifts in NHD History and Action Plans in Place
2
NHD Create Process 2002 USGS, USFS, and others begin work to produce 24k (High Resolution) NHD Different file types used to create initial point, line and polygon vector datasets Digital Line Graph (DLG) Cartographic Feature File (CFF) Tagged Vector Hydro (TVH) Technicians assigned to do a group of quadrangles within a subbasin Most quadrangles were in North American Datum 1927 (NAD27) and had to be converted to NAD 1983 by transformation 2007 Conversions and conflation of Nationwide 24K (High Resolution) geodatabase completed
3
What was used in the NHD Create Process? (AK 98% TVH or other data; HI, PR, Guam mostly DLG)
4
Discovery of Horizontal Datum Shifts November 2008 - Dean Tyler and a colleague from USGS Earth Resources Observation and Science (EROS) developed method to compare NHD streamline end-points with DLG end-points Examined 1271 7.5’ quadrangles 36 quads were determined to have a horizontal datum shift (>28M shift) 4 quads were in the “possible” category Two contiguous groups of quadrangles - 15 in VA, 18 in NM Total USGS 7.5 Minute Quadrangles – 65,532 20,806 quads converted from only DLG, most other quads were converted from CFF (6668), CFF+DLG (3697), or TVH (34361) Dean estimated that approximately 3% of quadrangles where DLG were used could be affected based on these findings – approximately 735 quadrangles
5
Linear Feature End-Point Comparison
6
Water Body Centroid Comparison
7
How did this happen? Seems to be limited to areas of grouped quadrangles Incorrect projection assigned upon conversion of source data Projection deleted or no transformation applied Source data incorrectly assigned projection
8
Horizontal Shift Across Quadrangle Boundary (NAD83 – NAD27)
9
Shifts are mostly apparent
10
Source Comparison Data Accuracy
11
Correcting Horizontal Datum Shifts Phase I – Detection and verification, establish areas of interest (AOI) Phase II – Extraction (clipping), conversion (pgdb2shp), transformation applied, visual check with source data Phase III – Erase, load feature changes (ArcCatalog Load), update status table (Load of ComID and Modify Geometry status) Phase IV – Edge matching and merge features Phase V – Verification of correction, Run QA/QC process, upload to repository
12
Questions or Comments?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.