Download presentation
Presentation is loading. Please wait.
Published byMoris Logan Modified over 9 years ago
1
May 2013 LIEBE Project T. Stora 1 LIEBE Progress Report Coordination meeting – 3 rd SC CEA-Saclay, 24 th May 2013 T. Stora – EN-STI-RBS
2
May 2013 LIEBE Project T. Stora 2 Pb/Bi loop online @ ISOLDE Static Pb/BI target already tested once at ISOLDE
3
May 2013 LIEBE Project T. Stora 3 Work packages WP definitionWP holderCoordinator WP1 : CoordinationCERNT. Stora WP2 : Conceptual Design and simulationsSCK-CENP. Schuurmans WP3 : Construction, assemblyCERNM. Delonca WP4 : InstrumentationCERNT. Mendonca WP5 : Safety and LicensingCEAA. Marchix WP6 : Target characterization and analysisPSID. Schumann WP7 : RadiochemistrySINPS. Lahiri WP8 : Offline commissioningIPULK. Kravalis WP9 : Online operationCERNT. Mendonca
4
May 2013 LIEBE Project T. Stora 4 Planning
5
May 2013 LIEBE Project T. Stora 5 Budget, Communication, etc 3 x 150 kCHF granted (2012-2014) Need spending estimates (WP 2-4) Don’t forget the sharepoint project site: https://espace.cern.ch/isobeam/Pb-Bi-Loop/default.aspx
6
May 2013 LIEBE Project T. Stora 6 News from WPs WP 1 : Next project coord meeting at CEN.SCK (high power targetry workshop). Coord+SC in Kolkata Jan 2014 WP 2 : 2 designs proposed and compatible with ISOLDE environment, pumps seem to be Ok, robot handling also: to be further tested, prototyped, checked against safety, WP 4 : slightly delayed (PSI will provide expertise, CERN holds the WP) WP 5 : some estimates by Fluka, well on tracks for recommendations taken into account in the design WP 6 : collections of Po done. 2 Draft publications. WP 7 : 1 st data on At and other isotopes inventories. WP 8 : Refurbishment of Radiochemical lab in progress. IPUL ? See following presentations
7
May 2013 LIEBE Project T. Stora 7 Items for SC Planning, budget ENSAR II High power target workshop in SCK.CEN
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.