Download presentation
Presentation is loading. Please wait.
Published byNathan Spencer Modified over 9 years ago
1
Car Hire Project By James W 8B
2
Charges Dodgy Car Hire$100 a day flat rate Unlimited kilometres Rip Off Car Hire$40 flat fee + 40¢ per km Risky Car Hire$0 flat fee and $2 per km Quotes from 3 car hire companies Task Find out which company to use for which distances
3
Task Outline Write out the algebraic fomula for each company using: C=cost, K=kilometres Construct a table in Excel Construct graphs in Graphmatica Prepare a report in Power Point
4
The Formulae Dodgy Car Hire$100 a day flat rate C=100 Rip Off Car Hire$40 flat fee + 40¢ per km C=0.4k+40 Risky Car Hire$0 flat fee and $2 per km C=2k
5
Excel Spreadsheet Using the formulae, we are able to construct the cost from each company in an Excel spreadsheet This provides a comparison of costs
6
The Graphs Using Graphmatica we were able to produce a graphical interpretation We then copied and pasted this into this Powerpoint presentation Added animations and important information
7
(25,50) (150,100) Dodgy: C=100 Rip Off: C=0.4k+40 Risky: C=2k Kilometres Cost 40
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.