OVERVIEW OF INSTALLING A DOUBLE TRUSS CAISHEN CONTAINER ARCH SHELTER

Similar presentations


Presentation on theme: "OVERVIEW OF INSTALLING A DOUBLE TRUSS CAISHEN CONTAINER ARCH SHELTER"— Presentation transcript:

1 OVERVIEW OF INSTALLING A DOUBLE TRUSS CAISHEN CONTAINER ARCH SHELTER
WELCOME OVERVIEW OF INSTALLING A DOUBLE TRUSS CAISHEN CONTAINER ARCH SHELTER

2 STEP ONE POSITION CONTAINERS
Prepare ground, slab and/or footings to the ballast requirements outlined in your manual. Position containers to the required distance apart then check that containers are at equal height, level and exact distance as outlined in Manual. Hint: Wait until first arch is installed before locking down containers.

3 Construct and Attach Canopy Base Rail
STEP TWO CANOPY BASE RAIL Construct and Attach Canopy Base Rail Assemble base rail sections, preferably on top of container, starting with the correct corner twist lock base plates, ensuring that rail is flush with edge of the container.

4 STEP THREE ASSEMBLE ARCHES
Assemble arches on ground then raise into position using crane, lifts and/or telehandler. Install purlins and end bracing as you go.

5 STEP FOUR INSTALL ANY END WALL FRAMES
Install End Wall Fabric and Doors Before Raising Canopy

6 Use Lifts and/or crane where possible
STEP FIVE PULL THE CANOPY Use Lifts and/or crane where possible

7 ENJOY PLEASE ENJOY YOUR SHELTER
We’ve put a lot of thought and design into providing you with an easy to assemble, strong, elegant and cost effective portable shelter. Refer to your manual always for exact assembly details.