Download presentation
Presentation is loading. Please wait.
Published byChad Bennett Modified over 9 years ago
1
Smart Energy v6 CPE Requirements draft-herbst-v6ops-cpeenhancements-00 Tom Herbst Don Sturek
2
802.15.4 at every residence California as an example – 5.5 Million in deployment at PG&E – 5.3 Million in deployment at SCE – 1.4 Million in deployment in San Diego Texas, Australia, UK, etc
3
IP on 802.15.4 IPv6, 6LoWPAN, ND, RPL RPL is route over – every hop a Link Local 6LoWPAN ND is not RFC4861 ND
4
802.15.4 802.11 requires layer 3 forwarding
5
Multiple routers likely 802.11 802.15.4 ISP Router Utility or Retail router 802.3
6
ULA’s for the HAN Stable but not Static – Not provider dependent Locally Routable Easy to distinguish – Not forwarded to the Internet More secure
7
ULA’s in the Mesh 802.15.4 mesh
8
Multiple ULA problem Generated a ULA prefix Generated a ULA prefix 802.15.4 mesh 802.11
9
Need a routing protocol RIPng
10
Firewall configuration? Incoming Blocked?
11
mDNS Use mDNS/DNS-SD for whole home service discovery – Expand scope of mDNS requests to Site Local – Expand scope of replies to DNS-SD Draft could have included requirement for whole home multicast
12
Suggested Next Steps Incorporate most into CPE document efforts – draft-wbeebee-v6ops-ipv6-cpe-router-bis-04 mDNS requirements to Cheshire – draft-cheshire-dnsext-multicastdns
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.