Presentation is loading. Please wait.

Presentation is loading. Please wait.

01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator.

Similar presentations


Presentation on theme: "01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator."— Presentation transcript:

1 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator Work-package from AB to TS department Collimator Work-package from AB to TS department Design strategy Design strategy Technical design Technical design Thermal and Mechanical Calculations Thermal and Mechanical Calculations Experimental validation of thermal calculations Experimental validation of thermal calculations Planning Planning Quality control - Manufacturing Quality control - Manufacturing Conclusions Conclusions

2 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 2 Logistics– Engineering– Design Manufacturing COLLIMATOR PROJECTRESOURCE PLANNING Project Leader: Ralph Assmann Ralph Assmann Project engineer: Oliver AberleEnrico Chiaveri Manfred Mayer Beam aspects, Mechanical engineering work package, Radiation issues, Cooling, Vacuum, Energy deposition, Machine protection, Beam instrumentation, Operation…… Coordination, mechanical engineering: Manfred Mayer Thermal and Mechanical Calculations Thermal and Mechanical Calculations: Alessandro Bertarelli Design strategy Technical design: Roger Perret Experimental validation: Sergio Calatroni

3 01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 3 Work-Package entrusted to our department: Work-Package entrusted to our department: –Mechanical engineering and analysis and design of six types of different collimators –Prototype design follow-up and production for SPS installation in August 2004, –Prototype design follow-up and production for SPS installation in August 2004, started in September ’03 –SPS life test and robustness test - first priority –Drawings for series production end of August Prototype manufacturing: well advanced Involved specialties: – –Design office, ANSIS thermo-mechanical simulations – –Workshop, Brazing, Surface Coatings, Metrology – –Water cooling, installation, remote handling LHC COLLIMATORS


Download ppt "01.07.2004 Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator."

Similar presentations


Ads by Google