Download presentation
Presentation is loading. Please wait.
Published byClemence Hoover Modified over 9 years ago
1
Coast Construction & Design
3
Challenges Challenge One –Staffing & Collaboration Challenge Two –Design Challenge Three –Execution
4
Staffing Construction –Project Executive Scott Davis –Project Manager Dustin Crowell –Project Superintendent Danielle Dorsey
5
Design –Principal Architect Philip Stott –Lead Designer Matthew Calvey –Specialist Coordinator Valerie Morin Staffing
6
Collaboration
7
Design Approach -Integrated Practice -Building Integrated Modeling (BIM) - Design for Change -adaptability / expansion - Professional Interaction Break down the barriers – connectivity -Permanent structures -Utilize existing grid
9
Architectural Integration -Integrated Practice (BIM) -Client/designer/builder -reduce cost & Time -Higher quality -Design Flexibility -Extensive Module Integration -Spatial Customization -Future expansion
10
Architectural Integration -Professional Interaction -Increase Chance encounters -Extend production through connection -Permanent Structure -building envelope -Independent utilities
11
New England Lab - Casework and furniture systems.
12
-3 Major Zones -Auditorium -Laboratory -Office/ Conference Space
14
-Sustainability -Social -Architectural
15
-Integrated Practice -Building Information Modeling
16
Flexibility
18
Mechanical, Electrical and Plumbing Sustainable Strategies Integration of systems
19
HVAC 3 systems for 3 functions Zoning - Module - special requirements
20
Plumbing Salt water supply High water quality - filtration systems - Thermal regulation
21
Stormwater Management Water efficient landscaping Renewable energy Sustainable Strategies
22
Challenge Three Estimate –Collaboration –Extensive database
23
Challenge Three Schedule –Long lead items –SIPS –Closeout
26
Challenge Three Site Logistics –Storage Units –temporary facilities –Lay-Down Area –Permits –Parking
28
Challenge Three Quality Control –On-site Quality control manager –Tagging Process
29
Challenge Three Safety –Safety Manager –S.T.O.P. Program
30
Conclusion We are the Right Team for the job –Experience –Collaboration
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.