Presentation is loading. Please wait.

Presentation is loading. Please wait.

Coast Construction & Design. Challenges Challenge One –Staffing & Collaboration Challenge Two –Design Challenge Three –Execution.

Similar presentations


Presentation on theme: "Coast Construction & Design. Challenges Challenge One –Staffing & Collaboration Challenge Two –Design Challenge Three –Execution."— Presentation transcript:

1 Coast Construction & Design

2

3 Challenges Challenge One –Staffing & Collaboration Challenge Two –Design Challenge Three –Execution

4 Staffing Construction –Project Executive Scott Davis –Project Manager Dustin Crowell –Project Superintendent Danielle Dorsey

5 Design –Principal Architect Philip Stott –Lead Designer Matthew Calvey –Specialist Coordinator Valerie Morin Staffing

6 Collaboration

7 Design Approach -Integrated Practice -Building Integrated Modeling (BIM) - Design for Change -adaptability / expansion - Professional Interaction Break down the barriers – connectivity -Permanent structures -Utilize existing grid

8

9 Architectural Integration -Integrated Practice (BIM) -Client/designer/builder -reduce cost & Time -Higher quality -Design Flexibility -Extensive Module Integration -Spatial Customization -Future expansion

10 Architectural Integration -Professional Interaction -Increase Chance encounters -Extend production through connection -Permanent Structure -building envelope -Independent utilities

11 New England Lab - Casework and furniture systems.

12 -3 Major Zones -Auditorium -Laboratory -Office/ Conference Space

13

14 -Sustainability -Social -Architectural

15 -Integrated Practice -Building Information Modeling

16 Flexibility

17

18 Mechanical, Electrical and Plumbing Sustainable Strategies Integration of systems

19 HVAC 3 systems for 3 functions Zoning - Module - special requirements

20 Plumbing Salt water supply High water quality - filtration systems - Thermal regulation

21 Stormwater Management Water efficient landscaping Renewable energy Sustainable Strategies

22 Challenge Three Estimate –Collaboration –Extensive database

23 Challenge Three Schedule –Long lead items –SIPS –Closeout

24

25

26 Challenge Three Site Logistics –Storage Units –temporary facilities –Lay-Down Area –Permits –Parking

27

28 Challenge Three Quality Control –On-site Quality control manager –Tagging Process

29 Challenge Three Safety –Safety Manager –S.T.O.P. Program

30 Conclusion We are the Right Team for the job –Experience –Collaboration


Download ppt "Coast Construction & Design. Challenges Challenge One –Staffing & Collaboration Challenge Two –Design Challenge Three –Execution."

Similar presentations


Ads by Google