Download presentation
Presentation is loading. Please wait.
Published byLucas Parrish Modified over 9 years ago
2
Chase Elementary Edgewater Elementary Leverette Elementary Ottawa River Elementary Riverside Elementary Sherman Elementary Spring Elementary Woodward High School
3
District enrollment declines are anticipated by State and District multi-year projections. District Staffing, Operational and Facilities needs are developed and designed to rapidly adjust to these anticipated trends. Source: Preliminary Official Statement; Actual figures are ADM (average daily membership) figures from an “at date enrollment” during annual October enrollment census.
4
School New Building Occupancy Current Enrollment K-8 Enrollment W/out Boundary Change Proposed Boundary Change K-8 Enrollment ChaseOpen234280 Edgewater194220 Ottawa River (K-8) Open514458 RiversideAug 2011393461446 ShermanOpen376515400 SpringNow Open314402481 Elementary Total 202523362283 LeveretteOpen4190418 WoodwardNow Open782 Total322631183485
5
School Closing: Lagrange Elementary
6
Minimize Student Movement Long Range Building Capacity Proximity to Locations Integrity of Neighborhoods Stay Within Learning Community Safety
7
Sherman Lagrange Edgewater Ottawa River Chase Riverside Spring
8
Sherman Leverette Edgewater Ottawa River Ottawa River (6-8) Chase Riverside
10
PROPOSED Leverette Boundary
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.