Download presentation
Presentation is loading. Please wait.
Published byKristin Griffin Modified over 9 years ago
1
Project Administration Hanna Poikela 22 June 2015 Summer School Edusafe Summer School 22 – 26 June 2015
2
Outline Training events Deliverable and Milestone reports Outreach and dissemination Non-technical responsibilities Secondments Summer School practicalities Edusafe Summer School 22 – 26 June 2015
3
Training Events Training eventTentative timing Summer SchoolJune 2015, CERN 1 st Joint training eventSeptember 2015, AUEB 2 nd Joint training eventDecember 2015, CERN Edusafe Summer School 22 – 26 June 2015 1 st Joint training event concentrates on business training 2 nd Joint training event includes training on CV writing and interview skills Technical meeting Testing campaign
4
Deliverable reports NoWPDeliverableAuthorReviewerDL D-4.24Flexible system architecture of display setups, usabilityYuta ItohG. Klinker31.3.2015 D-2.32 Algorithm designed for WRM tested and design concept translated in the first executive layout for multi-project run. A. Abdallah, D. Felici, NS. LakshmiPrabha, P. Mousouliotis, A. Crivellaro, Y. Verdie G. Aielli31.3.2015 D-3.33 PSS module, CS, DAQ first prototype developed, performance test and system documentation F. Alam, E. AdamidiS. Katsikas31.5.2015 D-5.35Technol. assessment & reverse engineering potentialV. MantziosK. Pramatari30.6.2015 D-3.43 PSS module, CS, DAQ 2nd prototype developed, performance test and system documentation 31.10.2015 D-4.54 New gamma imager, reconstruction algorithms and new fast dose calculation algorithms, including AR features performance and validation test campaign 31.10.2015 D-4.34 Report on scenario, technical options and evaluations of suitable display setups for selected scenarios 31.10.2015 D-6.16Integrated VR/AR system prototype 31.1.2016 D-2.42 3D imaging, visualizer & tracking system and patch recognition method developed and integrated into visualization system and WRM acceleration platform. Validation tests completed. 31.1.2016 D-2.52Final prototype, evaluation board and starter ready for final test in ATLAS 31.1.2016 D-5.45Business plan, Financial plan, IPR protection plan 31.1.2016 D-3.53 PSS system module, CS, DAQ HW+ SW final doc. incl. final tests results and recommendations, and incl. report on scalability and adaptability to different infrastructure and environmental conditions 31.1.2016 D-6.26Validation of data from demonstration 30.6.2016 D-5.55Market feedback on prototype and demonstration 31.7.2016
5
Milestone reports Edusafe Summer School 22 – 26 June 2015 NoWPMilestoneAuthorReviewerDL MS-203 PSS module first prototype manufactured, Control system and DAQ first prototype developed F. Alam, E. Adamidi S. Katsikas31.3.2015 MS-162 First WRM layout, prod. and system integration; function library for executing patch based algorithms and Hough transform on WRM A. Abdallah, D. Felici, NS. LakshmiPrabha, P. Mousouliotis, A. Crivellaro, Y. Verdie G. Aielli31.3.2015 MS-275Reverse engineering methodology completedV. MantziosK. Pramatari15.5.2015 MS-265Technology assessment and framework + market study completedVasileios MantziosK. Pramatari30.6.2015 MS-172 Final WRM prototype integrated in the DAQ system; performance test of the pattern recognition libraries accelerated by the WRM A. Abdallah, D. Felici, NS. LakshmiPrabha, P. Mousouliotis, A. Crivellaro, Y. Verdie G. Aielli31.7.2015 MS-213PSS module final prototype developed F. Alam, E. Adamidi S. Katsikas31.7.2015 MS-244 Display infrastructure interactivity protocol and user interface developed, gamma imaging camera HW/SW prototype developed 31.10.2015 MS-306Integrated VR/AR system tested and integrated into CERN PSS 31.1.2016 MS-316 Integrated VR/AR system demonstrated in simulated planned maintenance activity at CERN and results validated 31.7.2016
6
Outreach and dissemination Visits to universities (D-1.5) Visits to high schools (D-1.6) Participation in annual Researchers Nights (D-1.7) Publications (D-1.8) Conferences (D-1.9) Edusafe Summer School 22 – 26 June 2015
7
Non-technical responsibilities Career Development plans – Update annually (responsibility of the beneficiary) Annual appraisal of research progress and training – Remember to do this (deliverable in Annex I) 2 nd Progress report due in September 2015 – WP annual reports – Researcher reports – PCDP update Edusafe Summer School 22 – 26 June 2015
8
Secondments Length: min 2 weeks – Otherwise considered a visit 30% rule Academia Industry List of secondments in Annex I, p. 27 Internal reporting Edusafe Summer School 22 – 26 June 2015
9
Communication training Novotel, Ferney-Voltaire – Start at 8.30 am – Transportation – Lunch at Novotel Pre-course work – 3 min presentation of your (life) story Enjoy! Have fun! Edusafe Summer School 22 – 26 June 2015
10
Dinner Café de l’Aviation Café de l’Aviation, today at 7pm Public transportation Tram 18 from Cern to Blandonnet (at 18.32) Chemin des Coquelicots 18, 1214 Vernier Menu Salade Paysanne Entrecôte Caravelle, Frites maison Moelleux au chocolat Edusafe Summer School 22 – 26 June 2015
12
Deliverables WP1 (not reports) NoWPDeliverableDLStatus D-1.11Kick-off meeting minutes09/2012Ok D-1.21 Project website completed and internal + external communication channels set up09/2012Ok D-1.31 Scientific, management and progress reports08/2013, 08/2014, 08/2015, 08/2016 Ongoing D-1.41 Agenda/minutes of SB and EC meetings-Ongoing D-1.51 Outreach: Visits by Fellows to universities completed02/2014 2/2015 2/2016 Ongoing D-1.6 Outreach: Fellows’ visit to high schools completed10/2015Ongoing D-1.7 Outreach: Fellows participation in annual Researchers Nights completed1/2014, 1/2015 3/2016 Ongoing D-1.8 Publications in journals8/2016Ongoing D-1.9 Participation of Fellows in conferences8/2016Ongoing D-1.10 Final report to the EC8/2016Not started Edusafe Summer School 22 – 26 June 2015
13
Milestones WP1 (not reports) NoWPMilestoneDLStatus MS-11 Project kick-off meeting; recruitment process for all partners validated9/2012Ok MS-21 Intake: 10 ESRs recruited2/2013Ok MS-31 Kick-off week for ESRs completed2/2013Ok MS-41 Review of periodic appraisals (supervisors-fellows) between CO and supervisors completed08/2013, 08/2014, 08/2015, 08/2016 Ongoing MS-51 Second intake: 2 ERs recruited M18Ok MS-61 Summer Schools 1 + 2 completedM18, M33Ongoing MS-71 First Joint Training Event 1 + 2 completedM22, M26Ongoing MS-81 Midterm review completed and accepted by European CommissionM24Ok MS-91 All Outreach activities (see deliverables list) completedM41 M-101 All Fellow secondments completedM42 M-111 Participation of Fellows in external conferences completedM42 M-121 Final conference completed with presentations from all FellowsM48 M-131 Articles in scientific journals publishedM48 M-141 Final report completed and accepted by European CommissionM48 Edusafe Summer School 22 – 26 June 2015
14
Milestones WP2-WP5 (not reports) NoWPMilestoneDLStatus MS-18, MS-22, MS-25, MS-28 2,3,4,5Local specific trainings completed4/2016Ongoing MS-295 Exploitation plan accepted by all partners8/2016Not started Edusafe Summer School 22 – 26 June 2015
15
Deliverables WP2-WP5 (not reports) Edusafe Summer School 22 – 26 June 2015 NoWPDeliverableDLStatus D-2.6, D-3.2, D-4.6, D-5.2 2,3,4,5 Annual appraisal of research progress and training2/2014, 2/2015, 4/2016 Ongoing D-2.7, D-3.6, D-4.7, D-5.6 Presentation of Fellow’s research at end conference8/2016Not started
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.