Download presentation
Presentation is loading. Please wait.
Published byMervyn Park Modified over 9 years ago
1
OLD DOMINION ASV TEAM Co-Captain Chris Shertzer Co-Captain Benjamin McKinley Adam Stofko Richard Blanchette Brittany Garman Ganesh Balasubramanian Zach Carpenter
2
HULL DEVELOPMENT Aluminum frame and demi-hull pontoon system Aluminum frame and demi-hull pontoon system Hydrostatic analysis completed. Hydrostatic analysis completed. Product drawings have been completed and submitted for fabrication. Product drawings have been completed and submitted for fabrication.
4
PROPULSION A Kort nozzle has been designed and tested using Solid Works A Kort nozzle has been designed and tested using Solid Works After approval has been given, 3D printing will begin After approval has been given, 3D printing will begin
5
OBSTACLE AVOIDANCE Code has been written Code has been written Waiting for test apparatus to begin debugging Waiting for test apparatus to begin debugging
6
AUTOMATED DOCKING Code is ready for testing Integration into the main code is being discussed Challenge Station layout
7
ACOUSTIC BEACON POSITIONING A device has been developed A device has been developed Testing is underway Testing is underway 3D Rhino model (McNeel North America, Seattle, WA)
8
UNDERWATER LIGHT IDENTIFICATION A test device has been built A test device has been built Awaiting light arrival Awaiting light arrival
9
GANTT CHART
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.