Download presentation
Presentation is loading. Please wait.
Published byGyles Smith Modified over 9 years ago
1
TDR Conventional Facilities Chapter 7
2
The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is today 3.How establishment of ESS affect current activities 4.Which companies and activities will be ESS nearest neighbors 5.Accessibilty for visitors and employees at ESS 6.Existing and planned infrastructure 7.Ground condition
3
Architecture ESS vision for architectural design of both buildings and landscape and how to meet those visions
4
Buildings Buildings required to house the ESS reseach equipment, machines and instruments and how to accommodate personnel, whether it is ESS staff or visitors
5
Landscaping installation Roads Parking space Cables and pipes Handling of stormwater Etc
6
Main services Different kind of electric systems Different kind of water systems Gas systems Fire extinguishing systems Heating systems Ventilation system Transport systems such as elevators, overhead crane systems and goods reception
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.