Download presentation
Presentation is loading. Please wait.
Published byShavonne Hubbard Modified over 9 years ago
1
UNC VMware Environment
2
UNC VMware Microsoft Windows 2003 (145 physical servers) HP hardware - Server and SAN infrastructure Developed a partnership with reseller, Zunesis Zunesis assessment – Executive summary Technical Roadmap Total Cost of Ownership Return on Investment Bundled cost into other approved projects and utilized IT one-time dollars to fund. Sept. 23, 20082CHECO Presentation
3
UNC VMware UNC VMware Environment 3 HP C7000 Blade Chassis: 4 HP Virtual Connect Modules for Networking 2 HP Virtual Connect Modules for Fiber Redundant paths for networking and fiber Currently 10 Blades with ESX 3.5 Update 2 Each Blade has: 2 AMD 2.8GHz 16GB Ram 1 NIC for Management 1 NIC for Vmotion HP EVA 4100 Configuration – EVA 4400 for E-Fort: LUNs are kept at 300GB 8 to 10 VMs per LUN Multiple paths Every ESX host has access to every LUN Sept. 23, 20083CHECO Presentation
4
UNC VMware Current status 34 production servers (24 migrated from Physical to Virtual) 12 test servers Services running in UNC VMware production environment https://Beardrive.unco.edu http://emergency.unco.edu (out of E-Fort) http://emergency.unco.edu SoftGrid (Application streaming) Campus printing services DHCP ResNet registration process (Cisco Network Registrar) Sept. 23, 2008CHECO Presentation4
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.