Presentation is loading. Please wait.

Presentation is loading. Please wait.

TEIN/APII(KR) Update & Agenda APAN-17/Backbone Com. 28 Jan 2004, Univ Hawaii, HNL Bo-Hyun SEO Director of APIICC, KISDI KOREA INFORMATION.

Similar presentations


Presentation on theme: "TEIN/APII(KR) Update & Agenda APAN-17/Backbone Com. 28 Jan 2004, Univ Hawaii, HNL Bo-Hyun SEO Director of APIICC, KISDI KOREA INFORMATION."— Presentation transcript:

1 TEIN/APII(KR) Update & Agenda APAN-17/Backbone Com. 28 Jan 2004, Univ Hawaii, HNL Bo-Hyun SEO Director of APIICC, KISDI seo@kisdi.re.kr KOREA INFORMATION STRATEGY DEVELOPMENT INSTITUTE

2 2 Contents 1. Overview 2. Int’l Links w/KR 3. APII 4. TEIN 5. Conclusion

3 3 Seoul Daejun Daegu Busan Gwangju Suwon GSR STARTAP (USA) 155 M JGN (JP) 1 G ATM Switch 155Mbps 2.5Gbps Router Remark DWDM 40 Gbps Gigabit Switch Over 2.5Gbps(planned) GSR GEANT (EU) 6 M 34M SingAREN (SG)  Backbone: 2.5~40G  Access: 155M~1G Backbone Topoloy … KOREN/KREONET & Int’l Links

4 4 KOREA JAPAN Singapore USA * Started with 2Mbps (Apr.98) * Upgraded to 8Mbps (Jul.99) * Upgraded to 1GBps (Apr.03) Started with 2Mbps (Oct.98) Upgraded to 8Mbps as of now … to be continued at least until 4Q2005 * Started with 45Mbps (May 01) KOREN/KREONet2 to STAR TAP Upgraded to 155M (May 03) APII(KR)

5 5 CN & KR agreed to KR-CN Link, moving forward to G+bs, also strengthening CJK cooperation and TEIN Expansion Link  a Steering Committee will be working soon (KISDI-CERNET…) TEIN/APII … with China

6 6 APII(KR) & TEIN in AP Backbone

7 7 TEIN Initiative … Origin (2000) TEIN Initiative endorsed at ASEM Summit 3 ASEM Leaders (Oct 2000)  recognized the importance of cooperation in IT  agreed to narrow the digital divide to promote the joint prosperity of the two regions emphasized the need to establish and expand information and research networks (TEIN Link) To enhance general cooperation between Asia-EU through more effective information flows To enhance research exchanges & cooperation To expand & diversify information connections

8 8 4Q2001  TEIN Link b/w KR-FR (KISDI-RENATER) w/2Mbs opened 1Q2002  Upgraded to 10Mbs  TEIN EGM2 agreed KR-FR link is to be continued & upgraded to 45M(34M in EU) ;  An ASEM partner from SEA will serve as a hub for the ASEAN members of ASEM 3Q2002  ASEM Leaders strengthened this effort with a decision that an EGM on TEIN Expansion to SEA be held in KL (ASEM Summit 4) TEIN Link … 2001-2002

9 9 TEIN Link … 2003 & beyond 3Q2003  TEIN2 upto 10Meuro announced 4Q2003  upgraded to 34Mbps PCR (45M from KR)  TEIN Expansion KR-MY  TEIN Expansion/APII Link KR-CH 1Q2004  TEIN2 Information Day (at EC)  TEIN2 Session at APAN-17 (at EWC)

10 10 EU Commissioner Liikanen announced TEIN2 Action (3Q2003)  Budget Max 10 Mil. Euro  Min 20% from Asian participating countries  Implementation by DANTE Time Schedule  Feasibility, Procurement …  Service: 3Q2005 – 4Q2007 Future & New Agenda … TEIN2 Action

11 11 TEIN Initiative … Understanding on TEIN &TEIN2 Current TEIN Link (KR-FR)  The present KR-FR Linkage is to be continued  The willingness to upgrade the link has been expressed by KR, EU NRENs & EC TEIN2 Action  Support DANTE in doing relevant activities for TEIN2 Action… technical, commercial and institutional Next Meeting for TEIN  May 2004, KL, MY  A type of PC is expected Refer to www.transeurasia.org

12 12 KOREA JAPAN Singapore USA 34Mbs pcr 12Mbps 1Gbps 155Mbps CHINA MALAYSIA NEA SEA TEIN Link Topology as of now … Before TEIN2 Action comes up (45Mbs) GEANT TEIN France UK Spain Italy Romania Austria Poland Lithuania Sweden Germany

13 13 TEIN & TEIN2 … Understanding to Action (2004- ) Current TEIN Link (KR-FR) Present TEIN Link will be upgraded to [155/622] Mbs Link cost is to be shared equally by KR & EU from now on (EC decision) Previous plan of TEIN Expansion to SEA might be affected by the progress of TEIN2 Action, considering also the demand of SEA

14 14 TEIN & TEIN2 … Understanding to Action (2004- ) TEIN2 Action (expectation in 1H2004)  DANTE is to move for Feasibility Study  Stakeholders (GO + NGO) are to express preliminary views  Commitment for TEIN2 through Gov’t  Scope of Agenda & Membership of PC to be defined & endorsed(?)  Compose PC and hold 1 st meeting  Basic Charter binding all stakeholders, not only direct beneficiary but also indirect beneficiary: right & oblgtn

15 15 Thank you seo@kisdi.re.kr


Download ppt "TEIN/APII(KR) Update & Agenda APAN-17/Backbone Com. 28 Jan 2004, Univ Hawaii, HNL Bo-Hyun SEO Director of APIICC, KISDI KOREA INFORMATION."

Similar presentations


Ads by Google