Presentation is loading. Please wait.

Presentation is loading. Please wait.

MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134.

Similar presentations


Presentation on theme: "MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134."— Presentation transcript:

1 MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134

2 Task 160 (TTCN) - Funding Task 160 (TTCN) - Funding Completion of all contracts for the received 3GPP 2001 funding (26 mm) for the 1 half of this year. PCG acknowledged the needs from TSG-T for the funding shift from FY 2002 to FY 2001 and approved the request. A call for the TTCN voluntary contributions has been circulated within the SDOs (ref. ETSI CL 2083). –Answer deadline set to end of May, –6 mm of the voluntary funding from Motorola received, –The remaining need for the 2 nd half of 2001 will be funded by the shifted funding. For the further spending request for TTCN project during FY2002 and 2003, requested budget (58mm with 50% extra allowance) will be discussed in October.

3 Progress & Measures Progress & Measures Progress in TTCN draft –400 TTCN test cases available in 34.123-3 v.102, –60 new GMM test cases drafted, –TTCN for SS control largely updated in accordance with ASP update v.102 (RAB reconfiguration, security & DL channel power control). During Feb. – May, 3 TTCN experts were available. Considering high CR volume in the core spec, two experts allocated for the TTCN maintenance. Warning: the goal for 460 TTCN test cases in June will NOT reached. (estimated 410). In order to maintain the Sept. goal to approve 34.123-3, additional 3-4 experts will be started soon. Their result is expected in August. –L2 (MAC, PDCP & BMC) tests, –Multi-cell TTCN tests (RRC measurement and idle mode), –SMS over PS.

4 TTCN plan 2002-2003


Download ppt "MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP-010134."

Similar presentations


Ads by Google