API 17Y Subsea chemical injection system RP for Design, Testing & Operation
Task Group Status June 23, 2015
2
Goals Utilized by operating companies, vendors & design contractors
Form basis for design and operation of safe, reliable and fit for purpose chemical injection system Taking into accounts past experiences
3
Status Table of content developed and agreed on
A lead for each section is identified. A writing group assisting the lead in developing each section has been formed. A review team for each section is established. Monthly progress report is conducted.
4
Hunting-International
Task Group Name Company 1 Farah Saidi BP 2 Allison Novak Murphy Oil 3 Andrew Grace IntecSea 4 Ann Davis Nalco-Champion 5 Bob Long US water Service 6 Christopher J Curran 7 David R. Simpson Cameron 8 Ferhat M Erdal CVX 9 Jake Hennig Oceaneering 10 Jason Strouse Wood Group 11 John Allen 12 Karthik Annadorai Gates Name Company 13 Marcelo Ligeiro Petrobras 14 Monte Goodner W Industries 15 Muge Demiroglo BP 16 Roy Chan 17 Sally Thomas Conoco Philips 18 Spiridon Ionescu IntecSea 19 Tomm Hermansen Oceaneering 20 Tom Lyons WGK 21 Tom Rogala Hunting-International 22 Wendell Love Emerson 23 Christy Lan BSEE
5
Proposed TOC Scope Normative References
Terms, Definitions, Acronyms, and Symbols System Definitions & Requirements General Concept Development General Requirements Functional Requirements Design Requirements System Ownership Interfaces General Engineering Disciplines Interface Interface to Host Facility Interface to Subsea Equipment Interface to Downhole Equipment Interface to Workover Control System Interface to Subsea Control and Monitoring Devices Surface Equipment General Requirements Functional Requirements Design Requirements
6
Proposed TOC Maintenance, Field Modifications & Life Extension
Subsea Equipment General General Requirements Functional Requirements Design Requirements Materials and fabrication Materials Fabrication Testing Qualification Testing Factory Acceptance Tests (FATs) Documentation Commissioning, Startup & Decommissioning Installation Commissioning Startup Operation Decommissioning Maintenance, Field Modifications & Life Extension Chemical Management Performance Verification Surveillance Control Data archiving Marking, Packaging, Storage and Shipping - Marking Packaging Storage and Shipping Annex A Operation guidelines Annex B Lesson learned/best practice
7
Lead/Assist/Review Team
Writing Section Section Title Lead Assist Review Comments 1 Scope Develop later 2 Normative References 3 Terms, Definitions, Acronyms, and Symbols 4 System Definitions & Requirements F. Erdel ? S. Thomas, S. Ionescu Need members to assist in this section. 5 Interfaces R. Chan D. Simpson, S. Ionescu A. Novak for section 5.4 6 Surface Equipment W. Love G. Monte, Bob Long, Bill Schneck S. Thomas 7 Subsea Equipment A. Grace J. Hennig, R. Chan, T. Rogala, W. Love D. Simpson, A. Novak, S. Ionescu 8 Materials and fabrication J. Strouse, H. Hermansen, T. Lyons, T Rogala D. Simpson 9 Testing J. Strouse, H. Hermansen, T Rogala D. Simpson, A. Novak 10 Commissioning, Startup & Decommissioning K. Annadorai 11 Maintenance, Field Modifications & Life Extension C. Curran, J. Allen, J. Strouse 12 Chemical Management ??? A. Davis, T. Lyons M. Demiroglu Paul is no longer avaialble. Need a new leader 13 Marking, Packaging, Storage and Shipping