The North Rankin ‘A’ Foundation Improvement Project Colin Roberts
2
Joint Venture Partners
4
Location of the NRA with respect to Karratha
5
Aerial view of Domgas & LNG onshore facilities – Burrup Peninsula
6
Aerial view of Train Construction at Withnell Bay
7
Overall Work Planned in the Foundation Improvement Project
8
Closer Detail
9
View of Guy-wires Installed on the FSS
10
+12 metre Deck Layout
11
View of NRA Showing +12m Decks
12
Leg B2 - +12m Level
13
Congestion
14
Makeshift Storage +36m Level
15
Drill Production Deck with Pipe Laydown taken over for Storage
16
King Bay Supply Base
17
Longyear 55 Diamond Drill Rig on B4
18
Typical Pile & Riser Arrangement
19
Casing and Jetting Grouting Strings
20
Flat-faced Milling Bit
21
Reverse Circulation Diagram
22
Drill String Make-up (Grouting and Belling)
23
Downhole Stabiliser
24
Downhole Assembly
25
Bell Footings Insert
26
Acceptable Bell Profile
27
Wirth BHA Belling Tool
28
BHA Belling Tool Schematic
29
Concrete Batching Plant
30
Wirth PBA Drilling Rig
31
Riser Handling Unit
33
10 tonne Electromagnet
34
Stinger Joint - Reinforcement
35
Underwater Remote Observation Vehicle on Board The Shelf Supporter