Solar Probe Plus A NASA Mission to Touch the Sun 16-19 March 2015 Instrument Suite Name Presenter's Name
2
2 Solar Probe Plus Mission CDR Instrument/Suite Name Science Overview 1 page Introduce instrument and science contribution to the mission 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
3
3 Solar Probe Plus Mission CDR Instrument/Suite Name Team 1 page Organization chart of the instrument/suite team members Include team member roles Include any key partners, subcontractors or major suppliers If appropriate, list suite chart and then chart for each team in each team section 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
4
4 Solar Probe Plus Mission CDR Instrument/Suite Name Instrument Overview 1 page General description of the instrument to the level of the major subsystems. Block diagram of the total instrument Serves as an introduction to the detailed presentations to follow 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
5
5 Solar Probe Plus Mission CDR Instrument/Suite Name Technical Changes since PDR 1 page Give each change (recommend table below). Give reason for change and provide impact, as appropriate, on resources of mass, power, size, telemetry, cost and schedule. Include any science requirement changes or add statement at bottom that there were no science requirement changes. Change since PDRReason for ChangeImpact on Resources 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
6
6 Solar Probe Plus Mission CDR Instrument/Suite Name Summary of Engineering Design 5 pages Design description Electrical and thermal instrument and components performance requirements Software architecture and design Mechanical design and analyses Descriptions of any engineering or technology developments Summarize resource requirements Table of mass and power for the components, including maturity of the estimates (EM measurement, Pro/E estimate, etc) Commanding and housekeeping telemetry requirements Power services required Margins Other Summarize drawing status (with definition of that status) Instrument Performance Describe any known shortcomings in instrument performance relative to known science requirements Identify any Long-Lead Time procurements 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
7
7 Solar Probe Plus Mission CDR Instrument/Suite Name CDR Summary 1 page Summarize I-CDR results Review board membership, dates Action item summary Liens (if any) 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
8
8 Solar Probe Plus Mission CDR Instrument/Suite Name Engineering Model 2-3 pages List items completed since I-CDR Link any new progress to action items where possible Include any peer reviews help between I-CDR and Mission CDR If Lien at CDR was established and work not completed, address detailed schedule to complete lien Fidelity of EM design (differences to FM) EM Test plan EM Test results Remaining work to FM build (example: remaining testing, drawing updates) 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
9
9 Solar Probe Plus Mission CDR Instrument/Suite Name Verification and Validation Plans 3-4 pages Describe the process for verifying all instrument interfaces (hardware & software), resources, form factor, performance and operations, environmental worthiness, and science performance requirements List documentation (V&V plans, TE-001, requirements verification matrix) Show a portion of your V&V matrix Explain how tools are used (DOORS, etc) Walkthrough an example flow from requirement to verification 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
10
10 Solar Probe Plus Mission CDR Instrument/Suite Name Assembly, I&T Description 3-4 pages Assembly, I&T description, including Flow chart(s) showing plans for the assembly, integration, functional and environmental testing (EMI, sniff, vibration, thermal balance, thermal vacuum, etc.), and calibration Major milestones in the I&T flow with dates Description of any cleanliness requirements imposed on the mission by the instrument as well as any special facilities needed Instrument alignment requirements and plans for verification of alignment Purge requirements and plans for maintaining purge Expected number of operating hours on the instrument at launch Identify any special facilities Discuss any risks including mitigation plans Test-as-you-fly exceptions (i.e., what does not get tested) Address Refurbishment plan if applicable 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
11
11 Solar Probe Plus Mission CDR Instrument/Suite Name Calibration 2 pages Detailed discussion of plans for instrument calibration facilities planned for calibration range of parameters over which the instrument will be calibrated any shortcomings to the calibration that bring into question the ability of the instrument to meet its mission science requirements 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
12
12 Solar Probe Plus Mission CDR Instrument/Suite Name Systems Assurance 1-2 pages Describe Performance Assurance Matrix Status Identify any exceptions and status of exceptions Identify any submitted waiver requests and status of approval (could be in back-up) Identify any expected waivers that will be submitted (could be in back-up) System Safety Discuss status of inputs to the Missile System Prelaunch Safety Package (MSPSP) Identify any safety hazards along with methods for controlling them 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
13
13 Solar Probe Plus Mission CDR Instrument/Suite Name Science Operations Center 1 page Top-level Science Operations Center description including: SOC/SDC driving requirements SOC/SDC design description SOC/SDC operating approach Changes since PDR Review date for the SOC CDR 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
14
14 Solar Probe Plus Mission CDR Instrument/Suite Name Flight Operations Description 2 pages Status of Command and Telemetry definitions Describe the flight operations including key elements of the instrument ground system that allows the operation of the instrument command definitions and critical housekeeping telemetry definitions commanding path and telemetry data concept of operations for command and data handling of your instrument during the commissioning phase of the mission as well as normal operations shall be presented. 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
15
15 Solar Probe Plus Mission CDR Instrument/Suite Name Risk Status 1 page Describe risk status, including 5x5 risk matrix Top 10 summary stop light chart showing instrument risks, consequences and likelihood 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary
16
16 Solar Probe Plus Mission CDR Instrument/Suite Name Development Status 1 page Describe development status, including Project schedule showing critical path, schedule reserves and margins List of threats to the schedule and schedule risk mitigation plans Trends in the schedule performance of the team such as the gain or loss of float along the critical path 16 - 19 March 2015 General note to teams: The # of slides per topics may vary per team and these can be adjusted as necessary Include a take-away statement that describes the Instrument Suite’s readiness to move onto flight build. Example: “Instrument Name is ready to move to flight build”
17
17 Solar Probe Plus Mission CDR Instrument/Suite Name 16 - 19 March 2015 Backup
18
18 Solar Probe Plus Mission CDR Instrument/Suite Name Phase C Peer Reviews Review# A/I# Open# Close# Concurred I-PDR Peer Review A Peer Review B I-CDR 16 - 19 March 2015
19
19 Solar Probe Plus Mission CDR Instrument/Suite Name Summary of Documentation Status 1 page Give a list of your documents and their release status Include requirements docs Specs Limited life item list Other matrix required documents CDRL status 16 - 19 March 2015
20
20 Solar Probe Plus Mission CDR Instrument/Suite Name Parts and Materials Status Summarize MIL and PIL approval status and procurement status 16 - 19 March 2015
21
21 Solar Probe Plus Mission CDR Instrument/Suite Name Red and Green Tag Items List red and green tag items 16 - 19 March 2015
22
22 Solar Probe Plus Mission CDR Instrument/Suite Name GSE 1 page - top-level summary only GSE design description, including EGSE and MGSE requirements and implementation associated with the GSE EGSE software including requirements, design and verification of EGSE software Instrument purge equipment Instrument shipping container Slings or other special fixtures needed to mount and align the instrument 16 - 19 March 2015