Download presentation
1
10-7 Using Rational Equations
Standard 15.0: Apply algebraic techniques to rate and work problems.
2
Vocabulary Problem-Solving Guidelines UNDERSTAND the problem
Develop and carry out a PLAN Find the ANSWER and CHECK
3
#1 Solving Work Problems
A contractor finds that it takes Crew A 6 hours to construct a wall of a certain size. Crew B takes 8 hours to construct a wall of the same size. How long will it take if they work together? Let x = the total number of hours to complete the job.
4
#1 Solving Work Problems
Working Together
5
#1 Solving Work Problems
6
#2 Solving Motion Problems
One boat travels 10 km/h faster than another. While one boat travels 120 km, the other travels 155 km. Find their speeds. Let t = time each boat traveled.
7
#2 Solving Motion Problems
Distance Rate Time SlowBoat 120 r t Fast Boat 155 r + 10 t Solve both equations for t
8
#2 Solving Motion Problems
Substitute the first equation for t
9
#3 Solving Number Problems
The reciprocal of two more than a number is three times the reciprocal of the number. Find the number.
10
#3 Solving Number Problems
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.