BCD input from WG2 WG2 12/08/2005 H. Hayano Chris Adolphsen Terry Garvey Hitoshi Hayano
2
Summary of BCD input WG2 R&D activities: EU: TTF(XFEL) US: SMTF,SLAC R&D Asia: STF --> will be summarized by regional directors
3
WG2: Main Linac
4
Modulator Klystron Cavity package Gradient Cryomodule configuration RF distribution Cryogenics Tunnel curvature Tunnel layout By WG5 Revisited by BCD task force
5
Modulator
6
Baseline Alternatives Bouncer-compensated pulse transformer modulator Marx-style generator, DTI (Direct switch), DC-to-DC converter
7
Klystron
8
Baseline Alternatives 10MW multi-beam klystron 10MW sheet beam klystron, 5MW Inductive Output Tube, 10MW 12 beam MBK
9
Cavity WG5
10
Cryomodule configuration
11
Cryomodule configuration Baseline 10MW klystron drives 24 TESLA cavities. considering 7% WG loss and 11% overhead for 35MV/m operation Cavities divided into three cryomodules, Quad package in every 4-th cryomodules, Cos(2 )type Quad + corrector windings+BPM, supported from GRP at center post, <10µm bunch-to-bunch resolution BPM Cavity spacing 283mm Contradiction with GG2-BCD!
12
Cryomodule configuration Alternatives 12 cavities in one cryomodule, Cavity spacing 250mm~180mm, HOM readout, Quad-BPM in separate cryostat, Putting movers on center support post and cryomodule support, Reduce Quad aperture to ~35mm, 1µm resolution BPM
13
RF distribution
14
Baseline Alternatives TESLA-TDR like distribution system, circulators and tuners(3-stub or E-H) in each cavity. Elimination of circulators.
15
Cryogenic system
16
Cryogenic system Baseline Alternatives TESLA-TDR like layout, except refrigerator spacing (but likely 5km). Maintenance length is half of the refrigerator spacing. U-tube or turn around for more shorter maintenance length,
17
Tunnel curvature
18
Tunnel curvature Baseline Alternatives The linac will follow the curvature of the earth, unless site-specific reason dictates otherwise. Laser-straight linac, Straight-line segments.
19
Tunnel layout
20
Tunnel layout Baseline Alternatives RF sources to be located outside the beam tunnel, to be distributed along a second tunnel or surface gallery that run parallel or near by the beam tunnel. Three WR650 WG to each rf unit (one WG per cryomodule) TESLA-TDR like layout. Contradiction with RF distribution BCD!
21
BCD RF unit
22
BCD RF unit cartoon Bouncer modulator Multi-beam klystron Pulse transformer LLRF & instrumentation RF waveguides cryomodules RF distribution Rey.hori