1 R. Bailey, PS/SPS days, January 2005 Towards the CCC

2 R. Bailey, PS/SPS days, January 2005 Status December 2004

3 R. Bailey, PS/SPS days, January 2005 Reminder of what CCC is about  Merging of PS and SL divisions into AB department in 2003  One Operations group  Only makes sense in a single control room  DG decided early in 2004 that this will be on the B874 site  Bring together under one roof  MCR operations  PCR operations  TCR operations  LHC cryogenic operations  Result; the Cern Control Centre  Operational from 2006

4 R. Bailey, PS/SPS days, January 2005 Issues addressed over the last year(s)  Requirements and modifications to building 874  Requirements and layout of the CCC  Interior design of the CCC  Specification and procurement of the consoles  Staff needed in the coming years  People involved;  R.Bailey, M.Bätz, B.Frammery, D.Manglunki, R.Saban, L.Serio (CCCWG)  M.Delrieux, R.Giachino, S.Knoops, E.Liénard, L.Randot, L.Stewart (IDOC)  M.Clark, D.Hartley, J.Wood (CCD)  R.Ballet, A.Bland, P.Charrue, J.J.Cloye, C.Frisk, R.Hopkins (AB/CO)  J.L.Baldy, S.Anghelone, M.Poehler, P.Vachetta (TS/CE)  L.Burguete-Oliete, M.Colin, R.Forrest, R.Lauckner ($$)

5 R. Bailey, PS/SPS days, January 2005 Modified building 874 - rez 625m 2

6 R. Bailey, PS/SPS days, January 2005 Modified building 874 - etage

7 R. Bailey, PS/SPS days, January 2005 CCC layout issues  Contents  35 control console modules  5 access console modules  4 Mail/etc PC tables  1 social area  Storage furniture  Consultants used  Several iterations  Criteria applied  Links between the facilities  Accessibility to different areas  Balance between open and closed  Density of people  Noise levels

8 R. Bailey, PS/SPS days, January 2005 CCC layout – final Laura Stewart AT/ECR SPS LHC PS TI cryo

9 R. Bailey, PS/SPS days, January 2005 CCC interior design issues  Lighting  7x11 direct/indirect (20%-80%) from ceiling provide background level of 200+ Lux  Task lighting at workstation level  Acoustics  Ceiling, walls, floor & furniture acoustically treated  Acoustic screens behind consoles  RT<0.6s  Interior decoration  3 Harmonious colour schemes from CCD  4 th chosen by IDOC

10 R. Bailey, PS/SPS days, January 2005 CCC interior design - final Mike Clark CCD

11 R. Bailey, PS/SPS days, January 2005 Consoles specification - final

12 R. Bailey, PS/SPS days, January 2005 Procurement; 4 firms invited to tender

13 R. Bailey, PS/SPS days, January 2005 Dates and schedules End of SPS run 2004 Building ready end 10/2005 CCC operational 02/2006 200420062005

14 R. Bailey, PS/SPS days, January 2005 Staff evolution for AB/OP

15 R. Bailey, PS/SPS days, January 2005 Outstanding issues  Standard computers for all consoles  Different OS  2006 start-up with existing 2004 applications  When to converge ?  4 different Access systems  SPS & EA as is  PS panels emulated  LHC new system  When to converge ?  Communications in/out/within CCC  Fast analog signals in CCC  Parking space  Office space

16 R. Bailey, PS/SPS days, January 2005 The bottom line  Restart all machines from CCC in 2006  PS and SPS off ~ 18 months  Remote operation  Long checkout periods  In case CCC is late  Keep MCR active  Access systems ?  2006 is going to be fun!