R. Bailey, PS/SPS days, January 2005 Towards the CCC
2
R. Bailey, PS/SPS days, January 2005 Status December 2004
3
R. Bailey, PS/SPS days, January 2005 Reminder of what CCC is about Merging of PS and SL divisions into AB department in 2003 One Operations group Only makes sense in a single control room DG decided early in 2004 that this will be on the B874 site Bring together under one roof MCR operations PCR operations TCR operations LHC cryogenic operations Result; the Cern Control Centre Operational from 2006
4
R. Bailey, PS/SPS days, January 2005 Issues addressed over the last year(s) Requirements and modifications to building 874 Requirements and layout of the CCC Interior design of the CCC Specification and procurement of the consoles Staff needed in the coming years People involved; R.Bailey, M.Bätz, B.Frammery, D.Manglunki, R.Saban, L.Serio (CCCWG) M.Delrieux, R.Giachino, S.Knoops, E.Liénard, L.Randot, L.Stewart (IDOC) M.Clark, D.Hartley, J.Wood (CCD) R.Ballet, A.Bland, P.Charrue, J.J.Cloye, C.Frisk, R.Hopkins (AB/CO) J.L.Baldy, S.Anghelone, M.Poehler, P.Vachetta (TS/CE) L.Burguete-Oliete, M.Colin, R.Forrest, R.Lauckner ($$)
5
R. Bailey, PS/SPS days, January 2005 Modified building 874 - rez 625m 2
6
R. Bailey, PS/SPS days, January 2005 Modified building 874 - etage
7
R. Bailey, PS/SPS days, January 2005 CCC layout issues Contents 35 control console modules 5 access console modules 4 Mail/etc PC tables 1 social area Storage furniture Consultants used Several iterations Criteria applied Links between the facilities Accessibility to different areas Balance between open and closed Density of people Noise levels
8
R. Bailey, PS/SPS days, January 2005 CCC layout – final Laura Stewart AT/ECR SPS LHC PS TI cryo
9
R. Bailey, PS/SPS days, January 2005 CCC interior design issues Lighting 7x11 direct/indirect (20%-80%) from ceiling provide background level of 200+ Lux Task lighting at workstation level Acoustics Ceiling, walls, floor & furniture acoustically treated Acoustic screens behind consoles RT<0.6s Interior decoration 3 Harmonious colour schemes from CCD 4 th chosen by IDOC
10
R. Bailey, PS/SPS days, January 2005 CCC interior design - final Mike Clark CCD
11
R. Bailey, PS/SPS days, January 2005 Consoles specification - final
12
R. Bailey, PS/SPS days, January 2005 Procurement; 4 firms invited to tender
13
R. Bailey, PS/SPS days, January 2005 Dates and schedules End of SPS run 2004 Building ready end 10/2005 CCC operational 02/2006 200420062005
14
R. Bailey, PS/SPS days, January 2005 Staff evolution for AB/OP
15
R. Bailey, PS/SPS days, January 2005 Outstanding issues Standard computers for all consoles Different OS 2006 start-up with existing 2004 applications When to converge ? 4 different Access systems SPS & EA as is PS panels emulated LHC new system When to converge ? Communications in/out/within CCC Fast analog signals in CCC Parking space Office space
16
R. Bailey, PS/SPS days, January 2005 The bottom line Restart all machines from CCC in 2006 PS and SPS off ~ 18 months Remote operation Long checkout periods In case CCC is late Keep MCR active Access systems ? 2006 is going to be fun!