Presentation is loading. Please wait.

Presentation is loading. Please wait.

D.Websdale: RICH Meeting 3-11-99 1. 2 Costs: L0 and L1 Readout Electronics.

Similar presentations


Presentation on theme: "D.Websdale: RICH Meeting 3-11-99 1. 2 Costs: L0 and L1 Readout Electronics."— Presentation transcript:

1 D.Websdale: RICH Meeting 3-11-99 1

2 2 Costs: L0 and L1 Readout Electronics

3 D.Websdale: RICH Meeting 3-11-99 3 Total Cost: Photodetectors and Readout

4 D.Websdale: RICH Meeting 3-11-99 4

5 5 Costs: L0/L1 Electronics (detail)

6 D.Websdale: RICH Meeting 3-11-99 6 Tasks requiring human resources, not included in Cost Estimate: PAD-HPD R&D:Development of SCTA128 (common with VTX) [1 iteration] Development and testing of prototype tubes Pre-prod:Design and commissioning of 2 optimised deposition facilities. Production:Testing of production Anode components. Supervision of production process. Post-prod:Testing of completed HPDs and readout.

7 D.Websdale: RICH Meeting 3-11-99 7 Tasks requiring human resources, not included in Cost Estimate: Pixel-HPD R&D:Testing of Pixel chip (common with ALICE) Development of Pixel chip (LHCb specific) [1 iteration] Development and testing of prototype tubes Production:Testing of production Anode components Post-prod:Testing of completed HPDs and readout

8 D.Websdale: RICH Meeting 3-11-99 8 Tasks requiring human resources, not included in Cost Estimate: MaPMT: R&D:Development of SCTA128 (common with VTX) [1 iteration] Adaptation of SCTA128 for MaPMT signals [1 iteration] Development of FE boards Pre-prod:Testing of FE chips Production:Assembly of modules Post-prod:Testing assembled MaPMT modules and readout

9 D.Websdale: RICH Meeting 3-11-99 9


Download ppt "D.Websdale: RICH Meeting 3-11-99 1. 2 Costs: L0 and L1 Readout Electronics."

Similar presentations


Ads by Google