Download presentation
Presentation is loading. Please wait.
Published byShanon Griffin Modified over 9 years ago
1
D.Websdale: RICH Meeting 3-11-99 1
2
2 Costs: L0 and L1 Readout Electronics
3
D.Websdale: RICH Meeting 3-11-99 3 Total Cost: Photodetectors and Readout
4
D.Websdale: RICH Meeting 3-11-99 4
5
5 Costs: L0/L1 Electronics (detail)
6
D.Websdale: RICH Meeting 3-11-99 6 Tasks requiring human resources, not included in Cost Estimate: PAD-HPD R&D:Development of SCTA128 (common with VTX) [1 iteration] Development and testing of prototype tubes Pre-prod:Design and commissioning of 2 optimised deposition facilities. Production:Testing of production Anode components. Supervision of production process. Post-prod:Testing of completed HPDs and readout.
7
D.Websdale: RICH Meeting 3-11-99 7 Tasks requiring human resources, not included in Cost Estimate: Pixel-HPD R&D:Testing of Pixel chip (common with ALICE) Development of Pixel chip (LHCb specific) [1 iteration] Development and testing of prototype tubes Production:Testing of production Anode components Post-prod:Testing of completed HPDs and readout
8
D.Websdale: RICH Meeting 3-11-99 8 Tasks requiring human resources, not included in Cost Estimate: MaPMT: R&D:Development of SCTA128 (common with VTX) [1 iteration] Adaptation of SCTA128 for MaPMT signals [1 iteration] Development of FE boards Pre-prod:Testing of FE chips Production:Assembly of modules Post-prod:Testing assembled MaPMT modules and readout
9
D.Websdale: RICH Meeting 3-11-99 9
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.