Keyport Public Schools Facility Planning 12/02/15
2
Keyport Central School Capital ProjectsCostPriority Replace Vacuum Pump in Boiler Room20,0001.9 Ahera Asbestos Abatement125,0002.1 Replace Lift by Gymnasium60,0002.1 Blacktop Paving60,0002.1 Fire Alarm Upgrade25,0002.3 Bathroom Upgrades-Alternate remaining110,0002.6 Locker Room Showers60,0002.9 Lighting Upgrade393,0002.9 Locker Room Floors20,0003.0 Unit Ventilators in Classrooms-1,030,0003.0 AC in Building1,580,0003.1 Water Fountains10,0003.3 Camera In Gymnasium5,0003.6 Deisel Generator500,0003.7 Upgrade Classroom Cabinetry20,0003.9 Additional Floor Finishes50,0004.3 Administrative Office Refurbishment20,0004.3 Stage Light1,500 Total4,089,500
3
Keyport High School Capital ProjectsCostPriority Boiler Replacement200,0001.4 Plumbing/Ongoing200,0001.6 Upgrade Science Lab70,0001.7 Asbestos Abatement Program-Ongoing150,0001.7 Third Floor Bathrooms69,0002.4 Gym Middle Door20,0002.9 Water Fountains10,0002.9 Boys/Girls Locker Shower Upgrade440,0003.0 Third Floor Flooring replacement50,0003.1 Gym Air Handlers318,0003.1 Floor Finishings-ongoing40,0003.3 Clocks-Ongoing2,0003.4 Gym Sound System20,0003.6 New Lockers125,0003.7 Gym Bleachers200,0003.9 Hands Free Hand Drying8,0004.0 LED Lighting375,0004.1 Counter Tops15,0004.7 Sound System83,000 Total2,395,000
4
District Capital ProjectsCostPriority Practice Field Completion50,0002.1 Salting Machine and Plow10,0002.9 Paving100,0003.1 Ath Field-Lighting370,0003.3 Curbing100,0003.4 Truck50,0003.6 Synthetic Track590,0003.7 Storage Barn-Ath Field125,0004.1 Board Office Rug15,0004.4 Ath Field-Snack Bar913,0004.9 Baseball Field- Hockey Field10,000 BOE Sound System28,000 Total2,361,000
5
Recommended Projects with associated costs Replace Vacuum Pump in Boiler Room-KCS20,000 Replace Lift by Gymnasium-KCS60,000 Blacktop Paving-KCS60,000 Upgrade Science Lab70,000 Practice Field Completion50,000 Salting Machine and Plow10,000 Baseball Field- Hockey Field10,000 Plumbing-KHS200,000 Boiler Replacement200,000 Ahera Asbestos Abatement-KCS&KHS175,000 Total855,000
6
Recommended for the 2016-2017 Budget Replace Lift by Gymnasium-KCS60,000 Blacktop Paving-KCS60,000 Upgrade Science Lab70,000 Practice Field Completion50,000 Salting Machine and Plow10,000 Baseball Field- Hockey Field10,000 Plumbing-KHS100,000 Total360,000
7
Recommend securing funds in reserve Boiler Replacement200,000 Ahera Asbestos Abatement- KCS&KHS175,000 Plumbing-KHS100,000 Total475,000
8
Projected Balances Capital Reserve Balance$705,984 Maintenance Reserve Balance +$352,722 Total Balance$1,058,706 Projects for 2016-2017 -$360,000 Updated Balance$698,706 Secured Funds for Upcoming Projects -$475,000 Future Reserve Balance$223,706
9
Possible Projects to Accumulate Savings For: Unit Ventilators-KCS $1,030,000 Athletic Field Lighting $ 370,000 Synthetic Track $ 590,000 Total $1,990,000
10
Possible Funding Scenario Reserve Accumulation $350,000 per year X 5 years $1,750,000
11
Discussion and Questions