EuCARD WP 7 – High Field Magnets Task 7.2.1 – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2.1.

Similar presentations


Presentation on theme: "EuCARD WP 7 – High Field Magnets Task 7.2.1 – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2.1."— Presentation transcript:

1 EuCARD WP 7 – High Field Magnets Task 7.2.1 – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2.1 – Radiation certification Status report Status Update Meeting – 07. 10.2011 Maciej Chorowski, Jaroslaw Polinski, Piotr Bogdan Faculty of Mechanical and Power Engineering

2 2 Outline Task 7.2.1 plan Irradiation cryostat status Sample irradiation time scale Task 7.2.1 summary

3 3 Task 7.2.1 plan Achieved Oct 2010 „Sample test map” report Achieved SOLTAN Institute Warsaw has been selected Achieved Oct 2010 „Sample test map” report

4 4 Conceptual design of the irradiation cryostat

5 5 I rradiation cryostat Level regulation system Level meter350W heater

6 6 I rradiation cryostat Nitrogen transfer line Modified Nitrogen tank

7 7 Irradiation cryostat status Most of cryostat elements are fabricated and assembled Sample holder is under the production The design of inlet of electron gun need to be changed for new NCBJ gun design – new inlet is expected in week 42 The level regulation system test is foreseen for week 41

8 8 Irradiation time scale

9 9 Task 7.2.1 Summary Irradiation cryostat – expected to be ready in week 42 Samples irradiation: Mid of Nov 2011 – August 2012 A formal agreement between PWR and TECHTRA for supply of irradiated materials (including irradiation) - signed in Oct 2011 Milestone 7.2.1 (M24) „ Methodology for the certification of radiation resistance of coil insulation material” is expected in Oct 2011 Conceptual design of dewar and insert for the electrical tests – December 2011

10 10 Task 7.2.1 plan Achieved Oct 2010 „Sample test map” report Achieved SOLTAN Institute Warsaw has been selected To be achieved within next 2 weeks Achieved Oct 2010 „Sample test map” report Start is delayed by 6 months, but finish is expected to be on time

11 EuCARD WP 7 – High Field Magnets Task 7.2.2 – Thermal models Status Raport EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2.2 – Thermal models Status Raport EuCard-WP7-HFM Collaboration Meeting – – CEA Grenoble 22.03.2011 Jaroslaw Polinski, Maciej Chorowski Faculty of Mechanical and Power Engineering

12 12 Outline Task 7.2.2 plan CEA Saclay thermal tests status CEA Saclay thermal modeling status Insulation test sample production at RAL PWR HeII cryostat status Task 7.2.2 summary

13 13 Task 7.2.2 plan Achieved Oct 2010 „Sample test map” report Achieved on time

14 14 CEA Saclay thermal tests status Unirradiated TGPAP - DETD and Cyanate Ester insulation thermal conductivity and Kapitza resistance measurement in HeII condition have been finished. To continue the work the irradiated samples have to be provided by PWR Development of the measurement rig for thermal conductivity and heat capacity in 4-300K temperature range is in the last testing phase where a known aluminum alloy is tested

15 15 CEA Saclay thermal modeling status Steady-state calculations and Quench simulations with the "conduction" model are finished Development of a simplified He II two-fluid model for the thermal calculation of the magnet. The results will be presented at The CHATS workshop in CERN next week Additional Deliverable 7.2.3 (M30): “Superfluid helium transport model for the thermal design of the high field Fresca 2 magnet” is foreseen

16 16 Insulation test sample production at RAL RAL mix 71, RAL Mix 237 and Cyanate ester thermal and electrical laminates are produced and distributed to PWR and CEA Saclay Mechanical samples will be cut out from 0.5mm laminate to the 6 mm width Tensile Test specimens. Availability of up to 1kN Tensile Test facility at PWR Mech. Dep. is investigated LARP insulation laminates are not produced yet – all components are bought, the production can start on request

17 17 PWR HeII cryostat status Cryostat general view Cryostat parts in vacuum space

18 18 PWR HeII cryostat status Top view of the cryostat with wiring Insert Measurement vessel Instrumentation and DAQ electronic

19 19 PWR HeII cryostat status Measurement vesselTop cover of measurement vessel

20 20 PWR HeII cryostat status Sample holder center flanges Sample holder sample flanges Center flanges instrumentation Heaters T-sensor

21 21 PWR HeII cryostat status 4 sample holders in the measurement vessel

22 22 PWR HeII cryostat status Shock tests with LN2 have been done Leak tests at 4bar GHe have been done Instrumentation is installed Connection of instrumentation to DAQ system is done LabView program for cryostat operation is done 6 sample holders are instrumented 4 thickness of unirradiated 71 Mix samples are ready for thermal test The first cool-down with LHe is scheduled for week 43

23 23 Task 7.2.2 Summary Thermal test of unirradiated Mix 71 in HeII conditions will be performed at PWR in week 43 A new Deliverable 7.2.3 (M30) “Superfluid helium transport model for the thermal design of the high field Fresca 2 magnet” is foreseen and nearly completed Development of the measurement rig for thermal conductivity and heat capacity in 4-300K temperature range is in the last testing phase LARP insulation laminates production can start on request

24 24 Task 7.2.2 plan Achieved Oct 2010 „Sample test map” report In progress 2 from 4 are done 3th will be done soon Achieved on time In progress, expected on time New Milestone achieved