1
Cosmic Frontier Experiment Status August 25, 2014 ExperimentLocationStatusStart of operations Nominal end of operations Physics SuperCDMSSoudanOperatingMar 2012Mar 2015?Dark Matter COUPP/PICO 2LSNOLABOperatingDec 2013Dec 2014?Dark Matter COUPP/PICO 60SNOLABOperatingJune 2013Dec 2015?Dark Matter Darkside 50LNGS (Gran Sasso) Operating/Cali brating Jan 2014Dec 2016?Dark Matter DAMICSNOLABOperatingDec 2012Dec 2014Dark Matter Dark Energy Survey CTIO, ChileOperatingSep 2013Feb 2018Dark Energy Pierre AugerArgentinaOperating20082015 (for FNAL)? High Energy Cosmic Rays HolometerMeson LabCommissioningSpring 20142015Spacetime
3
COUPP/PICO Operations Summary Main objective over next 6 months is to continue particulate sampling and understand particulate nucleation of bubbles – Water from both PICO-2L and COUPP60 extracted via filter in early July – Clear evidence for particulates in both, samples sent to PNNL for radioactivity and chemical analysis
4
COUPP/PICO Operations Summary Test chamber set up at Fermilab to do spike tests, now running at Lab A Testing radon emanation sources now Will do particulate spikes through Aug-Sept
7
Season 2 started on August 15, 2014! First few nights had excellent seeing (resolution), setting some records ~0.6 ‘’ Two large air conditioners installed and started running to control daytime temperatures. This will further improve seeing. Year 1 data processing is nearly complete. Y1A1 dataset will be released later this Fall. Shortly after that initial public data release will take place. Serendipitous discovery of superluminous supernova. One of several papers to be submitted this Fall from early DES data. Dark Energy Survey Seeing on Aug. 15 Supernova DES13S2cmm Before SNAfter SN Subtraction
10
Holometer (E-990) Operations Status: Stability is most impacted by low frequency external noise. Recent fixes: Tethered external hut to concrete blocks to reduce wind noise below 5 Hz transmitted into ground motions Tuned feedback loops to add resonant gain at problematic frequencies and reduce gain elsewhere to maintain phase margin Installed laser periscope enclosures designed to reduce turbulent flow of air driven by temperature gradients (and hence reduce refraction noise) 8/25/2014 Design beam intensity already achieved with sensitivity to 10 -20 m/rtHz disturbance amplitude Analysis is underway on 30 minute dataset for first graduate student thesis Focus now on improving operations stability to more easily gather 10’s of hours of data