www.ieagreen.org.uk Summary of the current status of studies Reports published since the last ExCo meeting Studies underway Studies about to start Other studies approved but not yet started Summary of voting on prioritisation of new studies Study Progress & Prioritisation (GHG/07/47)
2
www.ieagreen.org.uk Reports Issued Since 31 st Meeting TitleContractor Publication date Report number CO 2 capture ready plantsE.ONMay 20072007/4 Impacts of CO 2 leaks on terrestrial ecosystemsBGSJuly 20072007/3 Capture of CO 2 from medium scale sourcesEcofysJuly 20072007/7 Remediation of leakage from geological storageARIAug. 20072007/11 Distributed CO 2 collectionGastecAug. 20072007/12 Co-production of hydrogen and electricity by coal gasification with CO 2 capture Foster Wheeler Sept. 20072007/13
3
www.ieagreen.org.uk Studies Underway - 1 TitleContractor Scheduled publication Improved oxygen production technologiesRodney AllamOctober 2007 Assessment of sub-sea ecosystem impactsMBARIJanuary 2008 Fuel cells for combined heat and power Jülich Research Institute March 2008 CO 2 capture in the cement industryMott MacDonaldMarch 2008 Regional capacity for CO 2 storage in IndiaBGSMarch 2008
4
www.ieagreen.org.uk Studies Underway - 2 TitleContractor Scheduled publication CO 2 pipeline transmission costsGastecJune 2008 Removal of impurities from CO 2 AdvanticaJuly 2008 Improved solvent scrubbing processesSINTEFJuly 2008 Assessment criteriaEPRIAugust 2008
5
www.ieagreen.org.uk Studies out to Tender or Contractor Selected Title Proposal number Safety considerations for CO 2 capture, transmission and injection 30-7 Operating flexibility of power plants with CCS – scoping study 31-2 Aquifer storage development issues31-8
6
www.ieagreen.org.uk Studies not yet Started Title Proposal number CO 2 capture in the iron and steel industry91 Prospects for storage of CO 2 in EOR108a Prospects for storage of CO 2 in gas fields108b Potential breakthrough capture processes30-2 Retrofit and repowering with CCS31-3 Estimation of CO 2 storage costs31-5 Best practise guidelines on site characterisation31-6
7
www.ieagreen.org.uk Study Prioritisation 12 outline proposals were submitted to the ExCo: 4 proposals re-submitted from the previous voting round 1 new proposal submitted by a Member 7 new proposals from the Programme Team Members were asked to vote for up to 5 studies and indicate their first choice 21 members voted Slightly more than last time Total number of members is 35 Presentations will be made on the top 5 proposals 11 members voted for 4 of these proposals 5 voted for 3 of them 5 voted for 2 of them
8
www.ieagreen.org.uk Proposals Receiving Most Votes No.TitleVotesFirst choices Weighted votes 32-6Developing guidelines for CO 2 storage – Remediation practices 17219 32-7Long term integrity of CO 2 storage – Well abandonment 15318 32-5Building the pipeline infrastructure16117 32-1Use of biomass with CCS11516 32-2 Capture of lower fractions of CO 2 10212
9
www.ieagreen.org.uk Other Proposals No.TitleVotesFirst choices Weighted votes 32-8 Natural analogues for CO 2 storage808 32-10 Production of energy carriers from low cost coal and opportunities for GHG abatement 606 32-3 CO 2 capture from small scale reformers in CHP systems 516 32-9Capacity ready516 32-11 Comparison of CCS, hydrogen and biomass for smaller scale energy users 314 32-12Abatement of CO 2 from marine transport202 32-4Trans-boundary CO 2 transmission and storage 202
10
www.ieagreen.org.uk Prioritisation of New Studies Should the Programme proceed with the studies which will be presented? Do the specifications properly describe the work required? Which of the proposals not selected at this meeting should be resubmitted for voting?