Download presentation
Presentation is loading. Please wait.
Published byBarry Gaines Modified over 9 years ago
1
First Mercury Test by Stuart Walker
2
Original Setup
3
Preliminary Prep Work
4
Data Acquisition
6
Primary Pump
7
Matthew Deep in Contemplation
8
Bo Pumping First Bottle of Hg
9
Waiting for Hg to Pump
10
Switching Hg Bottles
11
Pumping Second Bottle
12
Hg Slugs in Tubing
15
Lifting Pump to Remove Hg from Tubing
17
Removing Tubes from Pump and Vessel
18
Determining Vessel Mass
20
Setting Up Pressure Sensor
22
Helium Charge
23
Helium Tank While Charging
24
Data Acquisition
25
Helium Charging
26
Helium Disconnect
28
Everyone Performing Their Duties
29
Helium Disconnect
30
Attaching Thermocouple
31
Attaching Tygon Tubing
33
Checking Temperature Controller Settings
34
Completing Temperature Control Flow Loop
35
Hg Cleanup From Pump
36
Hg Cleanup From Catch Pans Using Hg Vacuum Pump
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.